摘要
Construction data from a large braced excavation are evaluated in comparison to several methods of predicting the response of buildings to excavation-induced ground movements. The project included an excavation of up to about 20 m depth over 650 m long, and 20 m wide made through generally competent glacial overburden. Excavation support was achieved using a braced soldier-pile and lagging wall system. A detailed instrumentation program was undertaken by the owner to monitor contractor compliance with ground and structure movement criteria. Data from 46 structures, with damage ranging from negligible to moderate categories, are presented, with four cases presented in detail. A modified approach to estimating potential damage categorization is provided and compared to case histories. Good agreement is demonstrated between actual and estimated damage categories.
引用
收藏
页码:210 / 223
页数:14
相关论文
共 50 条
  • [31] Settlement behavior of piled raft foundation supporting residential building adjacent to tall pile foundation building
    Hamada, Junji
    Yamashita, Kiyoshi
    Nakane, Kazutomi
    GEOTECHNICS FOR SUSTAINABLE INFRASTRUCTURE DEVELOPMENT, 2020, 62 : 27 - 32
  • [32] Comparative Analysis of Excavation Schemes for a Tunnel Constructed through Loose Deposits
    Xiao, J. Z.
    Dai, F. C.
    Wei, Y. Q.
    Xing, Y. C.
    Cai, H.
    Xu, Chong
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (04)
  • [33] Cause investigation of damages in existing building adjacent to foundation pit in construction
    Zhang, Xuemin
    Yang, Junsheng
    Zhang, Yongxing
    Gao, Yufeng
    ENGINEERING FAILURE ANALYSIS, 2018, 83 : 117 - 124
  • [34] Measurement and Analysis of the Effect of Shield Tunnelling of Hangzhou Subway on the Adjacent Building
    Wei, Gang
    Li, Jian
    Yu, Xing-Fu
    INTERNATIONAL CONFERENCE ON MECHANICS, BUILDING MATERIAL AND CIVIL ENGINEERING (MBMCE 2015), 2015, : 857 - 863
  • [35] Behavior of isolated floating pile adjacent to deep excavation reinforced by dual-row batter pile wall
    Wu, Yibin
    Ge, Hongbin
    Liu, Guangqing
    Li, Xuejian
    Ye, Jinbi
    MECHANICS OF ADVANCED MATERIALS AND STRUCTURES, 2023, 30 (15) : 3032 - 3050
  • [36] Analysis of deformation characteristics of foundation pit of metro station and adjacent buildings induced by deep excavation in soft soil
    Liu Nian-wu
    Chen Yi-tian
    Gong Xiao-nan
    Yu Ji-tao
    ROCK AND SOIL MECHANICS, 2019, 40 (04) : 1515 - +
  • [37] Investigation of three-dimensional deformation mechanisms of box culvert due to adjacent deep basement excavation in clays
    Bu, Fanmin
    Yu, Wenrui
    Chen, Li
    Wu, Erlu
    GEOMECHANICS AND ENGINEERING, 2022, 30 (06) : 565 - 577
  • [38] Comparisons between measured and computed responses of piles adjacent to tunnelling operations
    Poulos, H. G.
    GEOTECHNIQUE LETTERS, 2011, 1 : 11 - 15
  • [39] A neural network expert system developed for predicting the ground settlement and the damage assessment of adjacent structures due to tunnel excavation
    Kim, CY
    Bae, GJ
    Hong, SW
    Moon, HK
    Oh, MY
    PROCEEDINGS OF THE NINTH (1999) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 1999, 1999, : 514 - 520
  • [40] Stress transfer mechanisms and settlement of a floating pile due to adjacent multi-propped deep excavation in dry sand
    Shi, Jiangwei
    Wei, Jiaqi
    Ng, Charles W. W.
    Lu, Hu
    COMPUTERS AND GEOTECHNICS, 2019, 116