AN ASSESSMENT OF HEURISTICS FOR FAST SCHEDULING OF GRID JOBS

被引:0
|
作者
Moeser, Florian [1 ]
Suess, Wolfgang [1 ]
Jakob, Wilfried [1 ]
Quinte, Alexander [1 ]
Stucky, Karl-Uwe [1 ]
机构
[1] Karlsruhe Inst Technol, Inst Appl Comp Sci, POB 3640, D-76021 Karlsruhe, Germany
来源
ICSOFT 2010: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON SOFTWARE AND DATA TECHNOLOGIES, VOL 1 | 2010年
关键词
Scheduling; Benchmarks; Heuristics; Computational grid; Restricted resources;
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Due to the dynamic nature of the grid and the frequent arrival of new jobs, rescheduling of already planned and new jobs is a permanent process that is in need of good and fast planning algorithms. This paper extends previous work and deals with newly implemented heuristics for our Global Optimizing Resource Broker and Allocator GORBA. Of a range of possibly usable heuristics, the most promising ones have been chosen for implementation and evaluation. They serve for the following two purposes: Firstly, the heuristics are used to quickly generate feasible schedules. Secondly, these schedules go into the start population of a subsequent run of our Evolutionary Algorithm incorporated in GORBA for improvement. The effect of the selected heuristics is compared to our best simple one used in the first version of GORBA. The investigation is based on two synthetically generated benchmarks representing a load of 300 grid jobs each. A formal definition of the scheduling problem is given together with an assessment of its complexity. The results of the evaluation underline the described intricacy of the problem, because none of the heuristics performs better than our simple one, although they work well on other presumably easier problems.
引用
收藏
页码:184 / 191
页数:8
相关论文
共 50 条
  • [21] A Modified Binary PSO Algorithm for Scheduling Independent Jobs in Grid Computing System
    Ghosh, Tarun Kumar
    Das, Sanjoy
    INTERNATIONAL JOURNAL OF NEXT-GENERATION COMPUTING, 2016, 7 (02): : 144 - 154
  • [22] An algorithm for jobs scheduling in computational grid based on time-balancing strategy
    Hu, YL
    Xiu, BX
    Zhang, WM
    Xiao, WD
    Liu, Z
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-9, 2005, : 3019 - 3024
  • [23] Multi-level hierarchic genetic-based scheduling of independent jobs in dynamic heterogeneous grid environment
    Kolodziej, Joanna
    Khan, Samee Ullah
    INFORMATION SCIENCES, 2012, 214 : 1 - 19
  • [24] Integration of task abortion and security requirements in GA-based meta-heuristics for independent batch grid scheduling
    Kolodziej, Joanna
    Xhafa, Fatos
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2012, 63 (02) : 350 - 364
  • [25] Grid Architecture for Scheduling and Load Balancing - An Assessment
    Priya, B.
    Gnanasekaran, T.
    2014 INTERNATIONAL CONFERENCE ON INFORMATION COMMUNICATION AND EMBEDDED SYSTEMS (ICICES), 2014,
  • [26] A COMPARISON OF HEURISTICS FOR SCHEDULING PROBLEMS IN TEXTILE INDUSTRY
    Nugraheni, Cecilia E.
    Abednego, Luciana
    JURNAL TEKNOLOGI, 2016, 78 (6-6): : 99 - 104
  • [27] Use of VNS heuristics for scheduling of patients in hospital
    Vlah, S.
    Lukac, Z.
    Pacheco, J.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1227 - 1238
  • [28] Heuristics for scheduling in a flow shop with multiple processors
    Brah, SA
    Loo, LL
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) : 113 - 122
  • [29] Configurable Scheduling Solution using Flexible Heuristics
    Harjunkoski, Iiro
    Bauer, Reinhard
    26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 2361 - 2366
  • [30] Industrial scheduling solution based on flexible heuristics
    Harjunkoski, Iiro
    Bauer, Reinhard
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 106 : 883 - 891