Stochastic optimization model for the weekly scheduling of a hydropower system in day-ahead and secondary regulation reserve markets

被引:45
作者
Chazarra, Manuel [1 ]
Garcia-Gonzalez, Javier [2 ]
Perez-Diaz, Juan I. [1 ]
Arteseros, Montserrat [3 ]
机构
[1] Tech Univ Madrid, Escuela Ingn Caminos Canales & Puertos, Dept Hydraul Energy & Environm Engn, Madrid 28040, Spain
[2] Comillas Pontif Univ, ICAI Sch Engn, Inst Res Technol, Madrid 28015, Spain
[3] Endesa SA, Madrid 28042, Spain
关键词
Day-ahead electricity market; Secondary regulation reserve market; Stochastic programming; Cascaded reservoir system; FORMULATION;
D O I
10.1016/j.epsr.2015.08.014
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Hydropower stands out for its fast response ability and flexible operation, playing a predominant role in the provision of regulation reserves. As hydro power is an energy-constrained generation technology, it needs to be protected against any possible deployment of the scheduled reserves. However, the few models that formulate a detailed hourly co-optimization of energy and regulation reserves, neglect infeasibilities that could be derived from the requested reserves in real-time. As the regulation reserve market is becoming increasingly important, hydro producers can no longer neglect such effect. This paper presents a stochastic optimization model to find the optimal hourly schedule of a set of hydraulically coupled hydropower plants to obtain the weekly operation that simultaneously maximizes the expected profit in both energy and regulation reserves markets. The model is formulated for a price-taker agent, and it considers a very detailed representation of the system including minimum-maximum water flows, net head dependency, and fractional water travel time. The main contribution is that the obtained solution protects a multi-reservoir system against risk of water and storage unavailability due to the uncertainty in real-time use of regulation-up and down reserves, respectively, and that the reserves deem the net head dependency. The paper presents a realistic case study where the proposed formulation has been tested successfully with real data from the Spanish electricity market. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:67 / 77
页数:11
相关论文
共 18 条
[1]   An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir [J].
Borghetti, Alberto ;
D'Ambrosio, Claudia ;
Lodi, Andrea ;
Martello, Silvano .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :1115-1124
[2]   Scheduling of Head-Sensitive Cascaded Hydro Systems: A Nonlinear Approach [J].
Catalao, J. P. S. ;
Mariano, S. J. P. S. ;
Mendes, V. M. F. ;
Ferreira, L. A. F. M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) :337-346
[3]   Experiences with mixed integer linear programming based approaches on short-term hydro scheduling [J].
Chang, GW ;
Aganagic, M ;
Waight, JG ;
Medina, J ;
Burton, T ;
Reeves, S ;
Christoforidis, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :743-749
[4]   Self-scheduling of a hydro producer in a pool-based electricity market [J].
Conejo, AJ ;
Arroyo, JM ;
Contreras, J ;
Villamor, FA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1265-1272
[5]   Strategic bidding for price-taker hydroelectricity producers [J].
De Ladurantaye, Daniel ;
Gendreau, Michel ;
Potvin, Jean-Yves .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :2187-2203
[6]   Derivation of Intertemporal Targets for Large Pumped Hydro Energy Storage With Stochastic Optimization [J].
Deane, J. P. ;
McKeogh, E. J. ;
Gallachoir, B. P. O. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) :2147-2155
[7]   Optimal scheduling of hydro-electric power generation with simultaneous participation in multiple markets [J].
Deng, Shi-Jie ;
Shen, Youxuan ;
Sun, Haibin .
2006 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION. VOLS 1-5, 2006, :1650-+
[8]   Cost assessment of efficiency losses in hydroelectric plants [J].
Galvis, J. C. ;
Padilha-Feltrin, A. ;
Yusta Loyo, J. M. .
ELECTRIC POWER SYSTEMS RESEARCH, 2011, 81 (10) :1866-1873
[9]  
Garcia-Gonzalez J., 2001, IEEE POWER TECH
[10]  
Garcia-Gonzalez J., 2003, IEEE POWER TECH