Scheduling jobs on parallel machines with sequence-dependent setup times

被引:191
作者
Lee, YH
Pinedo, M
机构
[1] COLUMBIA UNIV, DEPT IND ENGN & OPERAT RES, NEW YORK, NY 10027 USA
[2] SAMSUNG ELECT, SEMICOND DIV, SYST SUPPORT GRP, SUWON 449900, SOUTH KOREA
关键词
scheduling; heuristics; parallel machines; setup time;
D O I
10.1016/S0377-2217(95)00376-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the weighted tardinesses. In the first phase, as a pre-processing procedure, factors or statistics which characterize an instance are computed. The second phase consists of constructing a sequence by a dispatching rule which is controlled through parameters determined by the factors. In the third phase, as a post-processing procedure, a simulated annealing method is applied starting from a seed solution which is the result of the second phase. In the dispatching rule of the second phase there are two parameters of which the values are dependent on the particular problem instance at hand. Through extensive experiments rules are developed for determining the values of the two parameters which make the priority rule work effectively. The performance of the simulated annealing procedure in the third phase is evaluated for various values of the factors. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:464 / 474
页数:11
相关论文
共 50 条
  • [41] Genetic algorithm with initial sequence for parallel machines scheduling with sequence dependent setup times based on earliness- tardiness
    Khanh Van, Bui
    Van Hop, Nguyen
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2021, 38 (01) : 18 - 28
  • [42] Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times
    Pan, Quan-Ke
    Gao, Liang
    Li, Xin-Yu
    Gao, Kai-Zhou
    APPLIED MATHEMATICS AND COMPUTATION, 2017, 303 : 89 - 112
  • [43] Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    Andres, Carlos
    Miralles, Cristobal
    Pastor, Rafael
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1212 - 1223
  • [44] Scheduling with sequence-dependent setup times and early-tardy penalties
    Santos, HCM
    Franca, PM
    MANAGEMENT AND CONTROL OF PRODUCTION AND LOGISTICS, VOL 1 AND 2, 1998, : 239 - 244
  • [45] Scheduling with deteriorating jobs and past-sequence-dependent setup times
    Peng-Jen Lai
    Wen-Chiung Lee
    Hong-Hui Chen
    The International Journal of Advanced Manufacturing Technology, 2011, 54 : 737 - 741
  • [46] Scheduling with deteriorating jobs and past-sequence-dependent setup times
    Lai, Peng-Jen
    Lee, Wen-Chiung
    Chen, Hong-Hui
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (5-8) : 737 - 741
  • [47] A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times
    de Paula, Mateus Rocha
    Mateus, Geraldo Robson
    Ravetti, Martin Gomez
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) : 938 - 949
  • [48] A genetic algorithm for scheduling open shops with sequence-dependent setup times
    Abreu, Levi R.
    Cunha, Jesus O.
    Prata, Bruno A.
    Framinan, Jose M.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 113
  • [49] Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
    Kia, H. R.
    Davoudpour, H.
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (14) : 4019 - 4042
  • [50] Iterated hybrid metaheuristic algorithms for unrelated parallel machines problem with unequal ready times and sequence-dependent setup times
    Chen, Chun-Lung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8) : 693 - 705