Scheduling jobs on parallel machines with sequence-dependent setup times

被引:191
|
作者
Lee, YH
Pinedo, M
机构
[1] COLUMBIA UNIV, DEPT IND ENGN & OPERAT RES, NEW YORK, NY 10027 USA
[2] SAMSUNG ELECT, SEMICOND DIV, SYST SUPPORT GRP, SUWON 449900, SOUTH KOREA
关键词
scheduling; heuristics; parallel machines; setup time;
D O I
10.1016/S0377-2217(95)00376-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the weighted tardinesses. In the first phase, as a pre-processing procedure, factors or statistics which characterize an instance are computed. The second phase consists of constructing a sequence by a dispatching rule which is controlled through parameters determined by the factors. In the third phase, as a post-processing procedure, a simulated annealing method is applied starting from a seed solution which is the result of the second phase. In the dispatching rule of the second phase there are two parameters of which the values are dependent on the particular problem instance at hand. Through extensive experiments rules are developed for determining the values of the two parameters which make the priority rule work effectively. The performance of the simulated annealing procedure in the third phase is evaluated for various values of the factors. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:464 / 474
页数:11
相关论文
共 50 条
  • [1] Scheduling jobs on parallel machines with sequence-dependent family set-up times
    Eom, DH
    Shin, HJ
    Kwun, IH
    Shim, JK
    Kim, SS
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (12) : 926 - 932
  • [2] Scheduling jobs on parallel machines with setup times and ready times
    Pfund, Michele
    Fowler, John W.
    Gadkari, Amit
    Chen, Yan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 764 - 782
  • [3] Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
    Driessel, Rene
    Moench, Lars
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (02) : 336 - 345
  • [4] Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times, Precedence Constraints, and Ready Times Using Variable Neighborhood Search
    Driessel, Rene
    Moench, Lars
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 273 - 278
  • [5] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Rubén Ruiz
    Carlos Andrés-Romano
    The International Journal of Advanced Manufacturing Technology, 2011, 57 : 777 - 794
  • [6] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Ruiz, Ruben
    Andres-Romano, Carlos
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8) : 777 - 794
  • [7] Joint scheduling of parallel machines and AGVs with sequence-dependent setup times in a matrix workshop
    Miao, Ming-Peng
    Sang, Hong-Yan
    Wang, Yu-Ting
    Zhang, Biao
    Tian, Meng-Xi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 185
  • [8] Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
    Kang, S
    Malik, K
    Thomas, LJ
    MANAGEMENT SCIENCE, 1999, 45 (02) : 273 - 289
  • [9] Bi-criteria formulation for green scheduling with unrelated parallel machines with sequence-dependent setup times
    Cota, Luciano P.
    Coelho, Vitor N.
    Guimaraes, Frederico G.
    Souza, Marcone J. F.
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2021, 28 (02) : 996 - 1017
  • [10] An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times
    Ezugwu, Absalom E.
    Akutsah, Francis
    IEEE ACCESS, 2018, 6 : 54459 - 54478