A non-zero integer non-linear programming model for maintenance workforce sizing

被引:16
|
作者
Ighravwe, D. E. [1 ]
Oke, S. A. [1 ]
机构
[1] Univ Lagos, Fac Engn, Dept Mech Engn, Lagos, Nigeria
关键词
Maintenance workforce; Productivity; Goal programming; Use factor; Priority factor; Routine maintenance; SIMULATION; OPTIMIZATION; ENVIRONMENT; ASSIGNMENT; STRATEGIES; ALLOCATION; PERSONNEL; WORKERS; SYSTEM;
D O I
10.1016/j.ijpe.2014.01.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper formulates a non-linear integer programming model to solve a maintenance workforce sizing problem with a productivity improvement goal. This problem is modelled in a bi-objective framework that minimises the number of maintenance personnel while maximising their productivity levels. Inputs into the optimisation model include monthly and routine maintenance periods, volume of production, contingency maintenance time, use factor and priority factor among others. The model has been validated with real-life detergent factory data, demonstrating its potential usefulness. A principal novelty of the model is the inclusion of use factor, which captures how often maintenance technicians are busy on the job with respect to assigned tasks, including unanticipated high maintenance workload. The model has been solved using a branch and bound algorithm. The impact of workforce structure and workers' salaries on model's performance has been studied and sensitivity analysis carried out to investigate the changes to the optimal solution as a result of changes in the input data. The results show a reduction in the number of maintenance workforce personnel in comparing values with and without use factor in the model. The model's ability to obtain global optimal result depends on the value of the minimum routine maintenance time within each maintenance section. Also, the model is shown to be sensitive to priority factor, which captures the appropriate ratio of full- and part-time workers under the same category. The model provides both an easy-to-use practical tool for maintenance managers and supervisors as well as a scientific tool for determining optimal maintenance workforce size for a manufacturing plant. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:204 / 214
页数:11
相关论文
共 50 条
  • [41] Optimum blends of different grades of surimi determined by non-linear programming
    Hsu, CK
    Chiang, BH
    FISHERIES SCIENCE, 2001, 67 (03) : 500 - 505
  • [42] Comparative Analysis of Linear and Non-Linear Programming Techniques for the Optimization of Ship Machinery Systems
    Baldasso, Enrico
    Elg, Mia
    Haglind, Fredrik
    Baldi, Francesco
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2019, 7 (11)
  • [43] Non-Linear Finite Element Modelling of a Test System for a Maintenance Robot
    Marjamaki, H.
    Makinen, J.
    Pertola, P.
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL STRUCTURES TECHNOLOGY, 2010, 93
  • [44] Design of radiant enclosures using inverse and non-linear programming techniques
    Daun, KJ
    Howell, JR
    Morton, DP
    INVERSE PROBLEMS IN ENGINEERING, 2003, 11 (06): : 541 - 560
  • [45] Multi-Objective Non-Linear Programming Problems in Linear Diophantine Fuzzy Environment
    Iqbal, Salma
    Yaqoob, Naveed
    Gulistan, Muhammad
    AXIOMS, 2023, 12 (11)
  • [46] Exploring Non-Linear Programming Formulations in QuantumCircuitOpt for Optimal Circuit Design
    Henderson, Elena R.
    Nagarajan, Harsha
    Coffrin, Carleton
    2022 IEEE/ACM THIRD INTERNATIONAL WORKSHOP ON QUANTUM COMPUTING SOFTWARE (QCS), 2022, : 36 - 42
  • [47] The archived-based genetic programming for optimal design of linear/non-linear controllers
    Mohammadi, Adel
    Nariman-Zadeh, Nader
    Jamali, Ali
    TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2020, 42 (08) : 1475 - 1491
  • [48] Application of a new hybrid non-linear Muskingum model to flood routing
    Bozorg-Haddad, Omid
    Mohammad-azari, Sahar
    Hamedi, Farzan
    Pazoki, Maryam
    Loaiciga, Hugo A.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT, 2020, 173 (03) : 109 - 120
  • [49] Validation of a dynamic non-linear grinding circuit model for process control
    le Roux, J. D.
    Steyn, C. W.
    MINERALS ENGINEERING, 2022, 187
  • [50] OPTIMIZATION OF LOAD UNIFORMITY FOR TRIANGULAR TUBE USING NON-LINEAR PROGRAMMING
    Sun, J.
    Ekwaro-Osire, S.
    MULTIDISCIPLINE MODELING IN MATERIALS AND STRUCTURES, 2007, 3 (01) : 121 - 140