A Systems Approach to Project Stakeholder Management: Fuzzy Cognitive Map Modeling

被引:24
作者
Sperry, Richard C. [1 ]
Jetter, Antonie J. [1 ]
机构
[1] Portland State Univ, Engn & Technol Dept, Portland, OR 97207 USA
关键词
project stakeholder; stakeholder analysis; sensitivity analysis; decision support; Fuzzy Cognitive Maps; DESIGN SCIENCE RESEARCH; TECHNOLOGY-ASSESSMENT; FRAMEWORK; PARTICIPATION; PERSPECTIVES; METHODOLOGY; KNOWLEDGE; SUCCESS;
D O I
10.1177/8756972819847870
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Projects that make effective use of project stakeholder management (PSM) tend to run smoothly and be successful because stakeholders understand and agree with the project approaches and outcomes. Projects with ineffective stakeholder management, on the other hand, frequently experience delays and cost overruns or may even be terminated. To date, project teams have limited methodological support for PSM: Existing methods are dominantly static and internally focused, making it difficult to manage so-called external stakeholders, who are not under the authority of the project manager. This work aims to improve PSM practice by closing the methodological gap. We developed a novel decision-support methodology, based on Fuzzy Cognitive Map (FCM) modeling that leverages stakeholders' public comments to anticipate the project's impacts on them and to make conflicts between stakeholder interests and project objectives transparent. A demonstration of the method is provided using a single case-namely, a longitudinal case study at Bonneville Power Administration (BPA), a federal agency that provides power to the Pacific Northwest.
引用
收藏
页码:699 / 715
页数:17
相关论文
共 76 条
[1]  
Aaltonen Kirsi, 2008, International Journal of Project Management, V26, P509, DOI 10.1016/j.ijproman.2008.05.004
[2]   Towards an improved understanding of project stakeholder landscapes [J].
Aaltonen, Kirsi ;
Kujala, Jaakko .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (08) :1537-1552
[3]   The establishment of legitimacy: the case of international projects [J].
Aaltonen, Kirsi .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2013, 6 (01) :13-+
[4]   Response strategies to stakeholder pressures in global projects [J].
Aaltonen, Kirsi ;
Sivonen, Risto .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (02) :131-141
[5]   Researching complex projects: Using causal mapping to take a systems perspective [J].
Ackermann, Fran ;
Alexander, James .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (06) :891-901
[6]   Strategic Management of Stakeholders: Theory and Practice [J].
Ackermann, Fran ;
Eden, Colin .
LONG RANGE PLANNING, 2011, 44 (03) :179-196
[7]  
Ackoff R., 1970, LONG RANGE PLANN, V3, P2, DOI [10.1016/0024-6301(70)90031-2, DOI 10.1016/0024-6301(70)90031-2]
[8]  
Alibage A., 2018, P 9 INT C ENV MOD SO
[9]   How to assess stakeholders' influence in project management? A proposal based on the Analytic Network Process [J].
Aragones-Beltran, Pablo ;
Garcia-Melon, Monica ;
Montesinos-Valera, Jesus .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (03) :451-462
[10]  
Axelrod R., 1976, Structure of Decision: The Cognitive Maps of Political Elites