The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study

被引:38
作者
Correia, Isabel [1 ]
Saldanha-da-Gama, Francisco [2 ]
机构
[1] Univ Nova Lisboa, Fac Ciencias & Tecnol, Dept Matemat, Ctr Matemat & Aplicacoes, P-2829516 Caparica, Portugal
[2] Univ Lisbon, Fac Ciencias, Dept Estat & Invest Operac, Ctr Invest Operac, P-1716049 Lisbon, Portugal
关键词
Project scheduling; Multi-skilled resources; Cost minimization; SUBJECT; BOUNDS;
D O I
10.1016/j.cie.2014.03.020
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we address a cost-oriented multi-skill project scheduling problem. The project consists on a set of activities such that, for some pairs, a start-to-start time dependency exists. The execution of each activity requires several skills. More than one resource of each skill may be required for processing an activity. A pull of multi-skilled resources is assumed. Costs are associated with resource usage and include fixed and variable costs. The former are incurred simply by using the resources; the latter depend on the final makespan of the project. For this problem, a mathematical programming modeling framework is proposed. The 'natural' model contains a non-linear objective function which, nonetheless, can be linearized at the expense of one additional set of continuous variables. The linearized model is enhanced using several sets of additional inequalities. The results of an extensive set of computational tests performed with the final model are reported. One major goal is to evaluate the possibility of using an off-the-shelf solver for tackling the problem. Another relevant goal is to understand the extent to which a cost-oriented objective influences the solutions obtained. Accordingly, we compare the solutions obtained using such objective with the solutions obtained using the traditional makespan minimization objective, often considered in project scheduling problems. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:230 / 238
页数:9
相关论文
共 20 条
[1]  
[Anonymous], 2007, ILOG CPLEX US MAN
[2]  
Bellenguez O, 2005, LECT NOTES COMPUT SC, V3616, P229, DOI 10.1007/11593577_14
[3]   Methods to solve multi-skill project scheduling problem [J].
Bellenguez-Morineau, Odile .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01) :85-88
[4]   A branch-and-bound method for solving multi-skill project scheduling problem [J].
Bellenguez-Morineau, Odile ;
Neron, Emmanuel .
RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) :155-170
[5]   Project scheduling with flexible resources: formulation and inequalities [J].
Correia, Isabel ;
Lourenco, Lidia Lampreia ;
Saldanha-da-Gama, Francisco .
OR SPECTRUM, 2012, 34 (03) :635-663
[6]   Optimization guided lower and upper bounds for the resource investment problem [J].
Drexl, A ;
Kimms, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (03) :340-351
[7]   An improved MIP-based approach for a multi-skill workforce scheduling problem [J].
Firat, Murat ;
Hurkens, C. A. J. .
JOURNAL OF SCHEDULING, 2012, 15 (03) :363-380
[8]   Competence-driven project portfolio selection, scheduling and staff assignment [J].
Gutjahr, Walter J. ;
Katzensteiner, Stefan ;
Reiter, Peter ;
Stummer, Christian ;
Denk, Michaela .
CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2008, 16 (03) :281-306
[9]   A survey of variants and extensions of the resource-constrained project scheduling problem [J].
Hartmann, Soenke ;
Briskorn, Dirk .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :1-14
[10]   Scheduling and staffing multiple projects with a multi-skilled workforce [J].
Heimerl, Christian ;
Kolisch, Rainer .
OR SPECTRUM, 2010, 32 (02) :343-368