Design and installation of suction piles for breakwater foundation

被引:0
作者
Bang, S. [1 ]
Cho, Y. [1 ]
Kwag, D. J. [1 ]
机构
[1] S Dakota Sch Mines & Technol, Rapid City, SD 57702 USA
来源
OCEANS 2005, VOLS 1-3 | 2005年
关键词
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A new break-water system, utilizing gravity-type concrete caisson superstructure on top of suction piles that act as the subsurface foundations, was designed and successfully installed in the field as part of an experimental project in 2004. The design utilized two concrete suction piles in a row with the diameter of 11 meters each. Four suction piles will support a 17.4 meter by 21.0 meter concrete caisson on top. instrumentation during installation included the measurements of the suction pressure, pile penetration, and pile tilts.
引用
收藏
页码:1 / 6
页数:6
相关论文
共 9 条
  • [1] Bang S, 2002, INT J OFFSHORE POLAR, V12, P56
  • [2] BANG S, 2000, USE SUCTION PILES MO
  • [3] BANG S, 2001, 20 INT C OFFSH MECH
  • [4] BANG S, 2001, 36 ANN S ENG GEOL GE, P703
  • [5] Transition of soil friction during suction pile installation
    Cho, Y
    Bang, S
    Preber, T
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 2002, 39 (05) : 1118 - 1125
  • [6] CHO Y, 2002, 12 INT OFFSH POL ENG
  • [7] COTTRILL A, 1992, OFFSHORE ENG
  • [8] LARSEN P, 1989, OFFSH TECHN C
  • [9] SENEPERE D, 1982, OFFSH TECHN C