FLEXIBILITY APPROACH IN CONSTRUCTION PROCESS ENGINEERING

被引:17
作者
Paslawski, Jerzy [1 ]
机构
[1] Poznan Tech Univ, Inst Struct Engn, PL-60965 Poznan, Poland
来源
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY | 2008年 / 14卷 / 04期
关键词
flexibility management; construction engineering; construction process; planning and monitoring;
D O I
10.3846/1392-8619.2008.14.518-530
中图分类号
F [经济];
学科分类号
02 ;
摘要
The issues of environmental impact on building processes constitute a permanent aspect of the building industry, irrespective of various preventive actions (prefabrication, robotics etc.). The proposed Method was developed in the course of tracking problems that arise during performance of building processes exposed to weather impact (as an example of interruptions) on construction sites of airports, highways, logistic centres, or installation of tall building facades. The proposed approach is based on creating multiple variants for process realization options, thus enabling adaptation to Current realization conditions at particular stages. The studies that have been carried Out confirm the advantage of this method over the traditional planning based oil a single realization variant.
引用
收藏
页码:518 / 530
页数:13
相关论文
共 36 条
[1]  
[Anonymous], 1994, MANAGEMENT INNOVATIO
[2]  
[Anonymous], MANAGEMENT INFORM SY
[3]  
[Anonymous], TEAM PERFORM MANAGE
[4]  
BARTOL K, 1996, MANAGEMENT PACIFIC R
[5]  
Booher H.R., 2003, HDB HUMAN SYSTEMS IN
[6]   GENERAL SYSTEMS-THEORY - THE SKELETON OF SCIENCE [J].
BOULDING, KE .
MANAGEMENT SCIENCE, 1956, 2 (03) :197-208
[7]   Dynamic strategic planning for technology policy [J].
de Neufville, R .
INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2000, 19 (3-5) :225-245
[8]  
DENEUFVILLE R, 2004, FACULTY MONOGRAPH MI
[9]  
EPPINK DJ, 1978, LONG RANGE PLANN, V11, P9
[10]   STRATEGIC FLEXIBILITY FOR HIGH TECHNOLOGY MANEUVERS - A CONCEPTUAL-FRAMEWORK [J].
EVANS, JS .
JOURNAL OF MANAGEMENT STUDIES, 1991, 28 (01) :69-89