A neuro-fuzzy risk prediction methodology for falling from scaffold

被引:37
作者
Jahangiri, Mehdi [1 ]
Solukloei, Hamid Reza Jamshidi [2 ]
Kamalinia, Mojtaba [3 ]
机构
[1] Shiraz Univ Med Sci, Res Ctr Hlth Sci, Dept Occupat Hlth, Sch Hlth, Shiraz, Iran
[2] Univ Tehran Med Sci, Dept Occupat Hlth Engn, Sch Hlth, Tehran, Iran
[3] Shiraz Univ Med Sci, Dept Occupat Hlth Engn, Sch Hlth, Shiraz, Iran
关键词
Risk of fall; Scaffold; Neuro-fuzzy modeling; Prediction; INFERENCE SYSTEM; HAZARD IDENTIFICATION; OCCUPATIONAL RISK; ANFIS MODEL; SAFETY; CONSTRUCTION; ERGONOMICS; MANAGEMENT; REGRESSION; CHECKLIST;
D O I
10.1016/j.ssci.2019.04.009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Fall from height is one of the most significant safety issues in the construction industry, due to the high number of fatal injuries. Scaffolds are a leading cause and have one of the highest injury rates. Therefore, it is crucial to introduce preventive measures and strategies. This study introduces a hybrid approach that merges an Adaptive Neural Network-based Fuzzy Inference System (ANFIS) and a safety inspection checklist to identify risk factors and predict the risk of falling from scaffold on construction sites. Our findings indicate that platform, joints, ladders, personal protective equipment and guardrails are the most important factors. The approach can identify and assess key conditions and situations that have the greatest impact on fall risk. The hybrid ANFIS-checklist model is found to outperform the regression method in predicting fall risk. Experts can use also this approach in other safety areas to identify and predict workplace risk.
引用
收藏
页码:88 / 99
页数:12
相关论文
共 51 条
[1]   Quantified risk assessment for fall from height [J].
Aneziris, O. N. ;
Papazoglou, I. A. ;
Baksteen, H. ;
Mud, M. ;
Ale, B. J. ;
Bellamy, L. J. ;
Hale, A. R. ;
Bloemhoff, A. ;
Post, J. ;
Oh, J. .
SAFETY SCIENCE, 2008, 46 (02) :198-220
[2]   Improving patient safety: Usefulness of safety checklists in a neonatal unit [J].
Arriaga Redondo, Maria ;
Sanz Lopez, Ester ;
Rodriguez Sanchez de la Blanca, Ana ;
Marsinyach Ros, Itziar ;
Collados Gomez, Laura ;
Diaz Redondo, Alicia ;
Sanchez Luna, Manuel .
ANALES DE PEDIATRIA, 2017, 87 (04) :191-200
[3]   A neuro-fuzzy algorithm for assessment of health, safety, environment and ergonomics in a large petrochemical plant [J].
Azadeh, A. ;
Saberi, M. ;
Rouzbahman, M. ;
Valianpour, F. .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2015, 34 :100-114
[4]   Improved prediction of mental workload versus HSE and ergonomics factors by an adaptive intelligent algorithm [J].
Azadeh, A. ;
Rouzbahman, M. ;
Saberi, M. ;
Valianpour, F. ;
Keramati, A. .
SAFETY SCIENCE, 2013, 58 :59-75
[5]   Interlocked projects in safety competency and safety effectiveness indicators in the construction sector [J].
Biggs, Herbert C. ;
Biggs, Sarah E. .
SAFETY SCIENCE, 2013, 52 :37-42
[6]   The analysis of the stages of scaffolding "life" with regard to the decrease in the hazard at building works [J].
Blazik-Borowa, E. ;
Szer, J. .
ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2015, 15 (02) :516-524
[7]   A national safety stand-down to reduce construction worker falls [J].
Bunting, Jessica ;
Branche, Christine ;
Trahan, Chris ;
Goldenhar, Linda .
JOURNAL OF SAFETY RESEARCH, 2017, 60 :103-111
[8]   Analysis of the safety conditions of scaffolding on construction sites [J].
Carlos Rubio-Romero, Juan ;
Rubio Gamez, M. Carmen ;
Antonio Carrillo-Castrillo, Jesus .
SAFETY SCIENCE, 2013, 55 :160-164
[9]   Work at height fatalities in the repair, maintenance, alteration, and addition works [J].
Chan, Albert P. C. ;
Wong, Francis K. W. ;
Chan, Daniel W. M. ;
Yam, Michael C. H. ;
Kwok, Albert W. K. ;
Lam, Edmond W. M. ;
Cheung, Esther .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (07) :527-535
[10]   A Takagi-Sugeno fuzzy model combined with a support vector regression for stock trading forecasting [J].
Chang, Pei-Chann ;
Wu, Jheng-Long ;
Lin, Jyun-Jie .
APPLIED SOFT COMPUTING, 2016, 38 :831-842