Strategies in performing a manual assembly task

被引:15
作者
Lim, John T. A. [1 ]
Hoffmann, Errol R. [1 ]
机构
[1] Univ Melbourne, Dept Mech Engn, Melbourne, Vic 3010, Australia
关键词
Assembly strategy; Manual assembly; Workplace design; VARIABLES;
D O I
10.1016/j.ergon.2015.06.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A study of naive participants' strategies in manual assembly is reported. Four groups of ten participants assembled hacksaws under varying conditions of the number of aids given to participants. The aids were provision of an assembly jig, instructions on use of the jig and components set up in an ergonomically-designed workplace. Assembly took place under four conditions: (a) with no jig or instructions (b) with a jig and with no instructions on its use (c) with a jig and with instructions and (d) with a jig, instructions and also an ergonomically designed workplace in which all parts were placed within the zone of convenient reach. Video recording was used to measure performance times and strategies in assembling the hacksaw. The 40 participants used a total of 32 models of liaison sequence and 152 patterns of assembly sequence. Participants used many different strategies in their early learning and generally settled down to a single pattern after the early trials. The common strategy of participants was to pick and assemble the longer and heavier components, followed by small and lighter components. Relevance to industry: Participants showed many different patterns of assembly, even for a simple product. The data indicate a need for the industrial engineer to determine the ergonomically best layout of components for assembly and demonstrate the best assembly sequence to the operator. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:121 / 129
页数:9
相关论文
共 26 条
[1]   CONCEPTUALIZING IN ASSEMBLY TASKS [J].
BAGGETT, P ;
EHRENFEUCHT, A .
HUMAN FACTORS, 1988, 30 (03) :269-284
[2]  
Baggett P, 1991, INT J IND ERGONOM, V7, P217
[3]  
Barnes R., 1980, Motion and time study, V7th
[4]  
Bourjault A., 1984, THESIS U FRANCHE COM
[5]  
CROSSMAN E. R. F. W., 1959, ERGONOMICS, V2, P153, DOI 10.1080/00140135908930419
[6]  
De Jong J. R., 1957, ERGONOMICS, V2, P153
[7]   SIMPLIFIED GENERATION OF ALL MECHANICAL ASSEMBLY SEQUENCES [J].
DEFAZIO, TL ;
WHITNEY, DE .
IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1987, 3 (06) :640-658
[8]  
DEMELLO LSH, 1989, IEEE INT C ROB AUT M, P56
[9]  
Fish L.A., 1993, THESIS
[10]  
Fish LA, 1997, HUM FACTORS ERGONOM, V7, P211, DOI 10.1002/(SICI)1520-6564(199722)7:3<211::AID-HFM4>3.0.CO