Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects

被引:18
|
作者
El-Kholy, Amr Metwally [1 ]
Akal, Ahmed Yousry [2 ]
机构
[1] Beni Suef Univ, Fac Engn, Dept Civil Engn, Bani Suwayf, Egypt
[2] Higher Inst Engn & Technol, Dept Civil Engn, Kafrelsheikh, Egypt
关键词
Financial viability; Public private partnership (PPP); Wastewater treatment plants (WWTPs); Risks; Allocation; Fuzzy synthetic evaluation (FSE); Developing countries; CAPITAL STRUCTURE OPTIMIZATION; DEVELOPING-COUNTRIES; SUPPLY PROJECTS; OPERATE; BUILD; PPP; CHINA; FRAMEWORK; RANKING; MODEL;
D O I
10.1108/ECAM-05-2020-0373
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This research investigates the financial viability risk factors that threaten the private investor's economic scheme in the public private partnership (PPP) wastewater treatment plant (WWTP) projects in Egypt. The aims of this study are to: (1) illustrate and cluster the financial viability risk factors in accordance with the PPP WWTP projects' nature, (2) assess the risk factors' criticality degrees according to their severity and frequency levels of the financial viability, and (3) pinpoint the suited allocation of the financial viability risk factors between the public and private parties. Design/methodology/approach Relying on the previous analysts' endeavors, the questionnaire method, the fuzzy synthetic evaluation approach and the hypothetical normal distribution curve model; the severity, frequency, criticality and allocation preference of 32 financial viability risk factors were assessed from 12 Egyptian PPP experts. Findings The data analysis yielded that foreign exchange risk, currency risk/inflation, license risk, construction cost-overrun and late site handover are the key factors in arising the financial viability risk issue in the PPP WWTP projects. Considering the discussion of these key risks, the study summarized that the financial viability's key risk factors are notably be affected by the economic, political and administrative circumstances of the host county. Additionally, the inflation lesion was found to be the core reason of most of the key risk factors. Originality/value This research originality stems from its contribution to address the gab in the PPP risk assessment literature of the concessionaire's financial viability in the WWTP projects in a country of developing economy as Egypt. This, first, enriches the scholarly based knowledge of the PPP projects' risk analysts of the developing countries. Accordingly, it moves the current PPP risk assessment research further to deeply apprehend these markets' risks. Second, it equips the policymakers in the public and private sectors of such projects with a map that clarifies their assigned risk factors and the responsibilities that each party should bear to generate a mutual stable investment environment for achieving their aims successfully. This, indeed, paves the way for more private investments to be involved in the developing markets' PPP projects with a profitable satisfactory level for the private concessionaire. In the same vein, more WWTP projects, which are highly needed for the public sector and its people, are executed.
引用
收藏
页码:3014 / 3040
页数:27
相关论文
共 50 条
  • [1] Risk Factors in IT Public-Private Partnership Projects
    Ghribi, Souhir
    Hudon, Pierre-Andre
    Mazouz, Bachir
    PUBLIC WORKS MANAGEMENT & POLICY, 2019, 24 (04) : 321 - 343
  • [2] Risk Allocation in Public-Private Partnership Projects
    Jin Xiaohua
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 326 - 330
  • [3] Equitable Financial Evaluation Method for Public-Private Partnership Projects
    柯永建
    刘新平
    王守清
    Tsinghua Science and Technology, 2008, (05) : 702 - 707
  • [4] Risk Misallocation in Public-Private Partnership Projects in China
    Ke, Yongjian
    Wang, Shouqing
    Chan, Albert P. C.
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2013, 16 (03) : 438 - 460
  • [5] Assessing the Effectiveness of Infrastructure Public-Private Partnership Programs and Projects
    Garvin, Michael J.
    Bosso, Doran
    PUBLIC WORKS MANAGEMENT & POLICY, 2008, 13 (02) : 162 - 178
  • [6] Evaluation Model for Assessing the Suitability of Public-Private Partnership Projects
    Cheung, Esther
    Chan, Albert P. C.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (02) : 80 - 89
  • [7] Critical Risk Factors of Transnational Public-Private Partnership Projects: Literature Review
    Yu, Yao
    Chan, Albert P. C.
    Chen, Chuan
    Darko, Amos
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2018, 24 (01)
  • [8] A holistic review of research studies on financial risk management in public-private partnership projects
    Akomea-Frimpong, Isaac
    Jin, Xiaohua
    Osei-Kyei, Robert
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2549 - 2569
  • [9] Identification of Critical Success and Risk Factors for Public-Private Partnership Highway Projects
    Fathi, Medya
    Shrestha, Pramen P.
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (01)
  • [10] The Influence of Critical Success Factors on Value for Money Viability Analysis in Public-Private Partnership Projects
    Almarri, Khalid
    Boussabaine, Halim
    PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 93 - 106