Due-date assignment and single-machine scheduling with generalised position-dependent deteriorating jobs and deteriorating multi-maintenance activities

被引:57
作者
Yin, Yunqiang [1 ,2 ]
Wu, Wen-Hung [3 ]
Cheng, T. C. E. [4 ]
Wu, Chin-Chia [5 ]
机构
[1] E China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang, Peoples R China
[2] E China Inst Technol, Coll Sci, Nanchang, Peoples R China
[3] Kang Ning Jr Coll, Dept Business Adm, Taipei, Taiwan
[4] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[5] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
基金
中国国家自然科学基金;
关键词
scheduling; deteriorating multi-maintenance activities; due-date assignment; deteriorating jobs; PROCESSING TIMES; TARDINESS; PENALTIES; EARLINESS; MODELS;
D O I
10.1080/00207543.2013.855833
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a single-machine scheduling problem with simultaneous consideration of due-date assignment, generalised position-dependent deteriorating jobs, and deteriorating maintenance activities. It is assumed that the actual processing time of a job is a general non-decreasing function depending on the number of maintenance activities performed before it and its position in a sequence. Moreover, the machine may be subject to several maintenance activities up to a limit over the scheduling horizon. The maintenance activities do not necessarily restore the machine fully to its original perfect state and the duration of a maintenance activity depends on its start time. The objective is to find jointly the optimal job sequence, maintenance frequency and maintenance positions to minimise an objective function that includes the cost of due-date assignment, the cost of discarding jobs that cannot be completed by their due dates and the earliness of the scheduled jobs under the popular CON and SLK due-date assignment methods. We provide polynomial-time solution algorithms for various versions of the problem.
引用
收藏
页码:2311 / 2326
页数:16
相关论文
共 31 条
[1]  
Alidaee B, 1999, J OPER RES SOC, V50, P711, DOI 10.2307/3010325
[2]  
[Anonymous], 2004, HDB SCHEDULING ALGOR
[3]  
[Anonymous], 1967, INEQUALITIES
[4]   Due-date assignment and parallel-machine scheduling with deteriorating jobs [J].
Cheng, T. C. E. ;
King, L. Y. ;
Ng, C. T. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (08) :1103-1108
[5]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[6]   Due-date assignment and single machine scheduling with deteriorating jobs [J].
Cheng, TCE ;
Kang, L ;
Ng, CT .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (02) :198-203
[7]   A concise survey of scheduling with time-dependent processing times [J].
Cheng, TCE ;
Ding, Q ;
Lin, BMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :1-13
[8]   Due date assignment in single machine with stochastic processing times [J].
Elyasi, Ali ;
Salmasi, Nasser .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (08) :2352-2362
[9]  
Gawiejnowicz S, 2008, MONOGR THEOR COMPUT, P3
[10]   A survey of the state-of-the-art of common due date assignment and scheduling research [J].
Gordon, V ;
Proth, JM ;
Chu, CB .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (01) :1-25