Preliminary risk assessment in it projects

被引:5
作者
Chernysheva, T. Y. [1 ]
机构
[1] Tomsk Polytech Univ, Yurga Technol Inst Branch, Yurga 652055, Kemerovo Region, Russia
来源
INNOVATION MATERIALS AND MANUFACTURING TECHNOLOGIES, ECONOMIC ASPECTS IN ENTERPRISES | 2013年 / 379卷
关键词
IT project; risk; management phases; risk management patterns; assessment methods;
D O I
10.4028/www.scientific.net/AMM.379.220
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
This paper examines approaches to preliminary risk management in IT projects. It states a need for a multi-level information system that would integrate all phases of the IT risk management cycle. We suggest using production rules to cluster risks and developing an integral risk assessment procedure based on the analytic hierarchy process.
引用
收藏
页码:220 / 223
页数:4
相关论文
共 5 条
[1]  
Chemysheva T. Y., 2013, PROBLEM RISK ANAL, V10, P44
[2]  
Chemysheva T. Y., 2012, POLZUNOVSKIY VESTNIK, P53
[3]  
Chemysheva T. Y., 2012, POLZUNOVSKIY VESTNIK, P70
[4]  
Klyuchnikov V. O., 2009, ELEKTRONNIY VEST SEP
[5]  
Kukanova N., MODERN METHODS TOOLS