Building hospital capacity planning mechanisms in Poland: The impact of 2016/2017 regulatory changes

被引:9
作者
Dubas-Jakobczyk, Katarzyna [1 ]
Sowada, Christoph [1 ]
Domagala, Alicja [2 ]
Wieckowska, Barbara [3 ]
机构
[1] Jagiellonian Univ, Inst Publ Hlth, Hlth Econ & Social Secur Dept, Coll Med, Grzegorzecka 20 Str, PL-31531 Krakow, Poland
[2] Jagiellonian Univ, Inst Publ Hlth, Hlth Policy & Management Dept, Coll Med, Krakow, Poland
[3] Warsaw Sch Econ, Social Insurance Dept, Warsaw, Poland
关键词
capacity planning; capital investments; health care needs; hospitals; HEALTH NEEDS-ASSESSMENT; NETWORK PERFORMANCE; CARE;
D O I
10.1002/hpm.2493
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Capacity planning is a crucial component of modern health care governance. The aim of this paper is to analyze the requirements that need to be met to build effective hospital capacity planning mechanisms in Poland. In this context, the recent regulatory changes strongly influencing hospital sector functioning, including introduction of health care needs maps, capital investment assessment, and hospital network regulations, are analyzed. Some possible ways forward, based on review of international experiences in hospital capacity planning, are discussed. Applied methods include literature review and analysis of statistical data as well as desk analysis of key national regulations related to hospital sector. Results indicate that at the system level, the process of capacity planning involves 4 elements: capital investment in facilities, equipment, and technology; service delivery; allocation of staff; and financial resources. For hospital capacity planning to be effective, the strategic decision at the macrolevel must be complemented by appropriate management of individual hospitals. The major challenge of building hospital capacity planning mechanism in Poland is imbedding it into the overall health system strategy. Because of the lack of such a strategy, the practical implementation of the ad hoc changes, which have been introduced, shows some inconsistencies. The regulations implemented between 2016 and 2017 provided a basis for hospital capacity planning, yet still need evaluation and adjustments. Also, including a mechanism for human resources planning is of crucial importance. The regulations should provide incentives for reducing oversized hospital infrastructure with simultaneous development of the long-term and coordinated care models.
引用
收藏
页码:E403 / E415
页数:13
相关论文
共 54 条
  • [1] AHA, FAST FACTS 2017
  • [2] [Anonymous], 2017, ZDROW OCHR ZDROW 201
  • [3] [Anonymous], 2014, ZESZYTY NAUKOWE OCHR, DOI DOI 10.4467/20842627OZ.14.024.3442
  • [4] [Anonymous], 2015, Eurostat regional yearbook 2015, P3, DOI DOI 10.2765/877631
  • [5] BAY KS, 1984, HEALTH SERV RES, V19, P141
  • [6] Biardzki M, 2017, MANAGER ZDROWIA, P46
  • [7] Bloor K, 2003, INT COMP REV
  • [8] Boyle S, 2011, HEALT SYST TRANSIT, V13, P1
  • [9] Hospital network performance: A survey of hospital stakeholders' perspectives
    Bravi, F.
    Gibertoni, D.
    Marcon, A.
    Sicotte, C.
    Minvielle, E.
    Rucci, P.
    Angelastro, A.
    Carradori, T.
    Fantini, M. P.
    [J]. HEALTH POLICY, 2013, 109 (02) : 150 - 157
  • [10] Buchan J., 2017, Health employment and economic growth: An evidence base