Development of Dalalven hydro power scheme in Sweden

被引:1
作者
Kokko, Voitto
Hjerthen, Peter
Ingfalt, Hans
Lowen, Karl-Erik
Sjogren, Arne
机构
[1] Hietaniementie 7, Leppiniemi
[2] Box 2087 Vaxnasgatan 10, Karlstad
来源
HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU | 2015年 / 04期
关键词
River Dalalven; hydropower; sheme; development; rehabilitation; upgrade; environment; fish pass; articial river; case studies;
D O I
10.1051/lhb/20150039
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The Dalalven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4TWh energy with a capacity of 970MW. The main reservoirs are Lake Siljan and Trangsletsjon with Trangslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990s and EU environmental targets in 2000s resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377GWh (29%) and capacity 124MW (59%). This energy decreases the annual CO2 emissions with 125 918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235G Wh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Trangslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy.
引用
收藏
页码:5 / 14
页数:10
相关论文
共 50 条
  • [1] Trend analyses of the small and medium hydro power development after the FIT scheme introduced in Japan
    Sakabe, Taichi
    Murakawa, Tomomi
    Nishida, Kento
    Ide, Jun'ichiro
    Sato, Tatsuro
    ENERGY REPORTS, 2020, 6 : 358 - 363
  • [2] A comprehensive analysis of strategies, policies and development of hydropower in India: Special emphasis on small hydro power
    Sharma, Naveen Kumar
    Tiwari, Prashant Kumar
    Sood, Yog Raj
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2013, 18 : 460 - 470
  • [3] Design and Development of Hybrid Wind-Hydro Power Generation System
    Kumar, Krishan
    Ansari, M. A.
    2013 INTERNATIONAL CONFERENCE ON ENERGY EFFICIENT TECHNOLOGIES FOR SUSTAINABILITY (ICEETS), 2013,
  • [4] Lessons from the Arctic past: The resource cycle, hydro energy development, and the human geography of Jokkmokk, Sweden
    Carson, Dean B.
    Carson, Doris A.
    Nordin, Gabriella
    Skold, Peter
    ENERGY RESEARCH & SOCIAL SCIENCE, 2016, 16 : 13 - 24
  • [5] Hydro/Power? Politics, Discourse and Neoliberalization in Laos's Hydroelectric Development
    Olson, Kathryn A.
    Gareau, Brian J.
    SOCIOLOGY OF DEVELOPMENT, 2018, 4 (01) : 94 - 118
  • [6] R & D in the field of hydro power in Northern Finland
    Aula, A
    PROCEEDINGS OF THE ARCTIC OPPORTUNITIES CONFERENCE, 1996, 22 : 246 - 250
  • [7] The assessment of stability of Grand Dallagkaus Landslide in reservoir of Zaramag Hydro Power Development, Russia
    Gaziev, E. G.
    Rechitski, V. V.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1901 - 1903
  • [8] Basic design aspects of micro hydro power plant and its potential development in Malaysia
    Mohibullah
    Radzi, MAM
    Hakim, MIA
    National Power & Energy Conference: PECon 2004, Proceedings, 2004, : 220 - 223
  • [9] Boosting the Power Generation in Wind and Hydro Power Production
    Bashurin, Victor P.
    Budnikov, Igor N.
    Khatunkin, Vitaliy Y.
    Klevtsov, Vladimir A.
    Ktitorov, Lev V.
    Lazareva, Anna S.
    Meshkov, Evgeny E.
    Novikova, Irina A.
    Pletenev, Fedor A.
    Yanbaev, Gennady M.
    JOURNAL OF SUSTAINABLE DEVELOPMENT OF ENERGY WATER AND ENVIRONMENT SYSTEMS-JSDEWES, 2016, 4 (03): : 279 - 292
  • [10] Hydro Power and Turbine Systems Reviews
    Elbatran, A. H.
    Abdel-Hamed, Mohamed Walid
    Yaakob, O. B.
    Ahmed, Yasser M.
    Ismail, M. Arif
    JURNAL TEKNOLOGI, 2015, 74 (05): : 83 - 90