Risk assessment of liquefied natural gas carriers using fuzzy TOPSIS

被引:22
作者
Elsayed, Tarek [1 ]
Marghany, Khaled [1 ]
Abdulkader, Said [1 ]
机构
[1] Arab Acad Sci & Technol & Maritime Transport, Dept Marine Engn, Alexandria, Egypt
关键词
risk assessment; multiple risk consequences; liquefied natural gas carriers; fuzzy sets; fuzzy TOPSIS; GROUP DECISION-MAKING; SYSTEM;
D O I
10.1080/17445302.2013.829964
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
An approach for the risk assessment of liquefied natural gas (LNG) carriers is proposed in this study. The approach is based on the use of the fuzzy technique of order preference by similarity to the ideal solution or fuzzy TOPSIS. In the proposed approach, probabilities and consequences of hazardous scenarios are represented by fuzzy sets to take into account imprecision associated with the subjective assignment of their values by experts. A case study for an LNG ship during loading and offloading at terminals is presented to illustrate the capability and effectiveness of the proposed fuzzy TOPSIS method and its difference from other qualitative techniques. Results show that the proposed approach is effective for handling imprecision often associated with subjective expert assessment of risk data. It gives more reasonable and robust risk ranking of the different hazardous scenarios. The proposed methodology is also applicable to other ship-operating modes such as transit in open sea and/or entering/leaving port.
引用
收藏
页码:355 / 364
页数:10
相关论文
共 19 条
[1]  
*ABS, 2000, GUID NOT RISK ASS AP
[2]   Application of axiomatic design and TOPSIS methodologies under fuzzy environment for proposing competitive strategies on Turkish container ports in maritime transportation network [J].
Celik, Metin ;
Cebi, Selcuk ;
Kahraman, Cengiz ;
Er, I. Deha .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) :4541-4557
[3]   Extensions of the TOPSIS for group decision-making under fuzzy environment [J].
Chen, CT .
FUZZY SETS AND SYSTEMS, 2000, 114 (01) :1-9
[4]  
Ding JF, 2011, J MAR SCI TECH-TAIW, V19, P341
[5]   Multi-attribute risk assessment of LNG carriers during loading/offloading at terminals [J].
Elsayed, Tarek ;
Leheta, Heba ;
Shehadeh, Mohamed .
SHIPS AND OFFSHORE STRUCTURES, 2009, 4 (02) :127-131
[6]   Fuzzy inference system for the risk assessment of liquefied natural gas carriers during loading/offloading at terminals [J].
Elsayed, Tarek .
APPLIED OCEAN RESEARCH, 2009, 31 (03) :179-185
[7]   Risk evaluation of tunneling projects [J].
Fouladgar, M. M. ;
Yazdani-Chamzini, A. ;
Zavadskas, E. K. .
ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2012, 12 (01) :1-12
[8]  
Hwang Ching-Lai, 1981, MULTIPLE ATTRIBUTE D, P58
[9]   Risk assessment model selection in construction industry [J].
KarimiAzari, AmirReza ;
Mousavi, Neda ;
Mousavi, S. Farid ;
Hosseini, SeyedBagher .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (08) :9105-9111
[10]   Fuzzy TOPSIS for group decision making: A case study for accidents with oil spill in the sea [J].
Krohling, Renato A. ;
Campanharo, Vinicius C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) :4190-4197