Lesotho Highlands water project - design of the 'Muela hydropower station

被引:0
作者
Arthur, EILJ
Wagner, CM
Hein, DIB
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A 72 MW hydropower station is included in phase 1A of the Lesotho Highlands water project to allow Lesotho to become self-sufficient in energy production, This paper describes the design of the 'Muela underground power station and regulating reservoir formed by a 55 m high dam. Features include the accommodation of hydraulic transients arising in the 45 km long upstream tunnel, the changes made in the dam to take account of a thin clay layer in one abutment and the special consideration given to the provision of a bypass to allow water transfer to take place when the station is out of commission.
引用
收藏
页码:43 / 53
页数:11
相关论文
共 6 条
[1]  
AIREY M, 1996, P 9 C BRIT DAM SOC U
[2]  
ARTHUR LJ, 1994, P TUNN 94 LOND
[3]  
*FED INT ING CONS, 1988, CONDITIONS CONTRACT
[4]  
*FED INT ING CONS, 1987, COND CONTR EL MECH W
[5]  
Hoek E., 1980, UNDERGROUND EXCAVATI
[6]  
Lombardi G., 1993, Int. Water Power Dam Constr, V45, P15, DOI DOI 10.1016/0148-9062(93)91546-U