Analytical model for corrosion penetration depth at cover cracking in RC structures

被引:1
作者
Song, Hua [1 ]
Niu, Ditao [1 ]
Liu, Siyuan [2 ]
机构
[1] Xian Univ Architecture & Technol, Key Lab Seism & Struct Engn, Minist Educ, Xian 710055, Peoples R China
[2] Beijing Elect Power Construct Res Inst SGCC, Beijing 100055, Peoples R China
来源
ADVANCES IN CONCRETE AND STRUCTURES | 2009年 / 400-402卷
基金
中国国家自然科学基金;
关键词
concrete; reinforcement corrosion; corrosion products; cover cracking; REINFORCED-CONCRETE; TIME;
D O I
10.4028/www.scientific.net/KEM.400-402.227
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Corrosion products which occupy much greater volume accumulate, and generate expansive pressures on the surrounding concrete. The pressure builds up and eventually leads to the cover cracking of the structures. The cracking accelerates further corrosion and leads to the loss of the bond strength and the load carrying capacity. Corrosion cracking would reveal the reducing of the residual service life of the corrosion-affected structures. In this paper, an analytical model is proposed to predict the critical corrosion penetration at cover cracking in RC structures based on the crack process. An attempt has been made to develop the model by considering material properties of the surrounding concrete and expansive corrosion products. The problem is established as a boundary-value problem and the governing equations are expressed in terms of the radial displacement. The analytical predictions of the proposed model have also been in agreement with the available experimental data.
引用
收藏
页码:227 / +
页数:2
相关论文
共 9 条
[1]   COVER CRACKING AS A FUNCTION OF BAR CORROSION .1. EXPERIMENTAL TEST [J].
ANDRADE, C ;
ALONSO, C ;
MOLINA, FJ .
MATERIALS AND STRUCTURES, 1993, 26 (162) :453-464
[2]  
BAZANT ZP, 1979, J STRUCT DIV-ASCE, V105, P1155
[3]   Analytical model for time to cover cracking in RC structures due to rebar corrosion [J].
Bhargava, Kapilesh ;
Ghosh, A. K. ;
Mori, Yasuhiro ;
Ramanujam, S. .
NUCLEAR ENGINEERING AND DESIGN, 2006, 236 (11) :1123-1139
[4]  
CEB-FIP, 1990, COM EUR BET FED INT
[5]   A model for prediction of time from corrosion initiation to corrosion cracking [J].
El Maaddawy, Tamer ;
Soudki, Khaled .
CEMENT & CONCRETE COMPOSITES, 2007, 29 (03) :168-175
[6]  
Liu YP, 1998, ACI MATER J, V95, P675
[7]   Modeling cover-cracking due to reinforcement corrosion in RC structures [J].
Pantazopoulou, SJ ;
Papoulia, KD .
JOURNAL OF ENGINEERING MECHANICS-ASCE, 2001, 127 (04) :342-351
[8]   Load carrying capacity of concrete structures with corroded reinforcement [J].
Rodriguez, J ;
Ortega, LM ;
Casal, J .
CONSTRUCTION AND BUILDING MATERIALS, 1997, 11 (04) :239-248
[9]   Modelling effects of corrosion on cover cracking and bond in reinforced concrete [J].
Wang, XH ;
Liu, XL .
MAGAZINE OF CONCRETE RESEARCH, 2004, 56 (04) :191-199