The job shop scheduling problem: Conventional and new solution techniques

被引:310
作者
Blazewicz, J
Domschke, W
Pesch, E
机构
[1] UNIV BONN, INST GESSELL & WIRTSCHAFTSWISSENSCH, D-53113 BONN, GERMANY
[2] POLITECH POZNANSKA, INST INFORMAT, PL-60965 POZNAN, POLAND
[3] TH DARMSTADT, INST BETRIEBSWIRTSCHAFTSLEHRE, D-64289 DARMSTADT, GERMANY
关键词
D O I
10.1016/0377-2217(95)00362-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
[No abstract available]
引用
收藏
页码:1 / 33
页数:33
相关论文
共 222 条
[1]  
Aarts E., 1989, Wiley-Interscience Series in Discrete Mathematics and Optimization
[2]  
Aarts E. H., 1994, ORSA Journal on Computing, V6, P118, DOI 10.1287/ijoc.6.2.118
[3]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[4]   EXTENDING CHIP IN ORDER TO SOLVE COMPLEX SCHEDULING AND PLACEMENT PROBLEMS [J].
AGGOUN, A ;
BELDICEANU, N .
MATHEMATICAL AND COMPUTER MODELLING, 1993, 17 (07) :57-73
[5]   A GRAPHICAL APPROACH TO PRODUCTION SCHEDULING PROBLEMS [J].
AKERS, SB .
OPERATIONS RESEARCH, 1956, 4 (02) :244-245
[6]  
ANDERSON EJ, 1995, OR56 U SOUTH
[7]  
[Anonymous], SCHEDULING
[8]  
[Anonymous], 1995, Scheduling theory and its applications
[9]  
[Anonymous], LEARNING AUTOMATED M
[10]  
[Anonymous], 1982, P PART NATO ADV STUD