Lot streaming with detached setups in three-machine flow shops

被引:30
作者
Chen, J [1 ]
Steiner, G [1 ]
机构
[1] MCMASTER UNIV,SCH BUSINESS,HAMILTON,ON L8S 4M4,CANADA
关键词
scheduling; flow shop; lot streaming;
D O I
10.1016/S0377-2217(96)00091-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Lot streaming is the process of splitting a job or lot to allow overlapping between successive operations in a multistage production system. This use of transfer lots usually results in a shorter makespan for the corresponding schedule. In this paper, we study the structural properties of schedules which minimize the makespan for a single job with detached setup times in a flow shop. Although the structure of the optimal schedules is more complex than in the case with no setups [9], it is possible to find the optimal solution with s sublets in O(log s) time for the three-machine case.
引用
收藏
页码:591 / 611
页数:21
相关论文
共 27 条