Multi-manned assembly line balancing with time and space constraints: A MILP model and memetic ant colony system

被引:18
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
Chica, Manuel [3 ,4 ]
机构
[1] Wuhan Univ Sci & Technol, Minist Educ, Key Lab Met Equipment & Control Technol, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
[3] Univ Granada, Andalusian Res Inst DaSCI Data Sci & Computat Int, E-18071 Granada, Spain
[4] Univ Newcastle, Sch Elect Engn & Comp, Callaghan, NSW 2308, Australia
基金
中国国家自然科学基金;
关键词
Time and space assembly line balancing; Multi-manned stations; MILP model; Ant colony optimization; Memetic algorithms; MATHEMATICAL-MODEL; ENERGY-CONSUMPTION; CYCLE TIME; ALGORITHM; OPTIMIZATION;
D O I
10.1016/j.cie.2020.106862
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the automotive and electronics industries, more than one operator work in the same workstation to assemble a high volume of products. When assigning the tasks of these products to workstations, we should fulfill the cycle time and precedence relationships. Limited research has investigated space restrictions to store tools or components (i.e., time and space assembly line balancing problem) but without multi-manned workstations. Therefore, this paper addresses the time and space assembly line balancing problem with multi-manned workstations. Our model includes five kinds of constraints by considering task assignment, precedence, cycle time, sequencing and space constraints. Our aim is to minimize the total number of workstations and operators via a new MILP model and memetic ant colony system. The memetic ant algorithm uses a new solution generation method which integrates 16 heuristic rules to help each ant of the algorithm to effectively build a feasible solution. New pheromone release strategies, including deposition and evaporation, are employed to update the global pheromone quantity. Additionally, a new best solution update method does not retain the solution with minimum objective function but balances the workload of each operator. Our experiments show the effectiveness of solving the MILP model by exact methods in small-scaled instances and the superiority of the memetic ant colony optimization algorithm in all the instances.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Parviz Fattahi
    Abdolreza Roshani
    Abdolhassan Roshani
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 363 - 378
  • [2] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Fattahi, Parviz
    Roshani, Abdolreza
    Roshani, Abdolhassan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4): : 363 - 378
  • [3] Note to: a mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Yilmaz, Hamid
    Yilmaz, Mustafa
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 89 (5-8): : 1935 - 1939
  • [4] Erratum to: Note to: a mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Hamid Yilmaz
    Mustafa Yilmaz
    The International Journal of Advanced Manufacturing Technology, 2017, 89 : 1941 - 1941
  • [5] Time and Space Multi-Manned Assembly Line Balancing Problem Using Genetic Algorithm
    Zamzam, Nessren
    Elakkad, Ahmed
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2021, 14 (04): : 733 - 749
  • [6] A Multi-Manned Assembly Line Worker Assignment and Balancing Problem With Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Lee, Sang Hyun
    Lee, Seung Gi
    Kim, Hyung Rok
    Kim, Hyun-Jung
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (03) : 7786 - 7793
  • [7] Constraint programming model for multi-manned assembly line balancing problem
    Cil, Zeynel Abidin
    Kizilay, Damla
    COMPUTERS & OPERATIONS RESEARCH, 2020, 124
  • [8] Balancing two-sided multi-manned assembly line under time and space constraint
    Zamzam, Nessren
    El-Kharbotly, Amin K.
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (03)
  • [9] A Hybrid Heuristic Algorithm for Multi-manned Assembly Line Balancing Problem with Location Constraints
    Krenczyk, Damian
    Dziki, Karol
    14TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS (SOCO 2019), 2020, 950 : 333 - 343
  • [10] The multi-manned joint assembly line balancing and feeding problem
    Zangaro, Francesco
    Minner, Stefan
    Battini, Daria
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (16) : 5543 - 5565