共 50 条
- [1] METHOD FOR THE OPERATION RESEARCH OF GAS-LIFT WELL OPERATION NEFTYANOE KHOZYAISTVO, 1988, (05): : 49 - 51
- [2] DETERMINATION OF THE EFFICIENCY OF GAS-LIFT WELL OPERATION NEFTYANOE KHOZYAISTVO, 1988, (03): : 53 - 56
- [3] DETERMINATION OF GAS LIFT VALVES ZONE DURING WELL OPERATION NEFTYANOE KHOZYAISTVO, 1992, (07): : 24 - 26
- [4] INCREASING THE PERIODIC GAS-LIFT WELL OPERATION EFFICIENCY NEFTYANOE KHOZYAISTVO, 1988, (11): : 40 - 43
- [5] Optimization of Gas Injection Allocation in a Dual Gas Lift Well System JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (03): : 0331011 - 0331017
- [7] The Optimization of Fracturing Parameters of Horizontal Well under Different Reservoir Conditions in Tight Sandstone Gas Reservoir PROCEEDINGS OF THE AASRI INTERNATIONAL CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (IEA 2015), 2015, 2 : 357 - 361
- [8] Approach for optimization of gas allocation to a group of well and oilfield in artificial lift Drilling and Production Technology, 2005, 28 (05): : 27 - 30
- [9] OPTIMIZATION OF WORKING AGENT DISTRIBUTION IN THE GAS-LIFT WELL SYSTEM NEFTYANOE KHOZYAISTVO, 1986, (08): : 36 - 39
- [10] COMPLEX ACOUSTIC DEVICE FOR THE CONTROL OF THE REGIME OF GAS-LIFT WELL OPERATION NEFTYANOE KHOZYAISTVO, 1987, (12): : 58 - 63