Estimates of Comparative Costs for Uprating Transmission Capacity

被引:27
作者
Baldick, Ross [1 ]
O'Neill, Richard P. [2 ]
机构
[1] Univ Texas Austin, Dept Elect & Comp Engn, Austin, TX 78712 USA
[2] Fed Energy Regulatory Commiss, Washington, DC 20426 USA
关键词
Flexible AC transmission systems (FACTS); transmission assets; EHV;
D O I
10.1109/TPWRD.2008.2002990
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, we estimate the costs of increasing transmission system capability through technologies for uprating transmission capacity without expanding the transmission footprint. We compare costs for uprating to the costs of new capacity.
引用
收藏
页码:961 / 969
页数:9
相关论文
共 20 条
[1]  
*AM SUP CORP, 2007, SEC SUP GRIDS UNPUB
[2]  
[Anonymous], 2004, IEEE Power & Energy Magazine, V2, P14
[3]  
[Anonymous], COMMUNICATION
[4]  
[Anonymous], CALIFORNIA INDEPENDE
[5]   Contract paths, phase-shifters, and efficient electricity trade [J].
Baldick, R ;
Kahn, E .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (02) :749-755
[6]   Planning for big things in Brazil [J].
Barroso, Luiz A. ;
Porrua, Fernando ;
Thome, Luiz M. ;
Pereira, Mario V. .
IEEE POWER & ENERGY MAGAZINE, 2007, 5 (05) :54-63
[7]  
Bergen A.R., 2000, Power Systems Analysis
[8]   EXPERIENCES WITH PARALLEL EHV PHASE-SHIFTING TRANSFORMERS [J].
BLADOW, J ;
MONTOYA, A .
IEEE TRANSACTIONS ON POWER DELIVERY, 1991, 6 (03) :1096-1100
[9]  
*COMP TECHN CORP, 2000, INN SOL POW IND
[10]  
DIXIT K, 2003, EMPIRICAL STUD UNPUB