Decision-making in the forum of distance Master of Project Management

被引:0
作者
Pena, Anie Bermudez [1 ]
Vera, Yasiel Perez [2 ]
Aguilar, Gilberto Fernando Castro [3 ]
Alcivar, Inelda Anabelle Martillo [3 ,4 ]
Victore, Roberto Delgado [1 ]
机构
[1] Univ Informat Sci, Havana, Cuba
[2] La Salle Univ, Arequipa, Peru
[3] Catholic Univ Santiago Guayaquil, Fac Engn, Guayaquil, Ecuador
[4] Univ Guayaquil, Fac Math & Phys Sci, Guayaquil, Ecuador
来源
CISETC 2019: INTERNATIONAL CONGRESS ON EDUCATION AND TECHNOLOGY IN SCIENCES | 2019年 / 2555卷
关键词
Decision-Making; Distance Education; Project Management;
D O I
暂无
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
Project management requires the mastery of documentation for decision-making in project management. Lack of knowledge and inexperience in decision-making affects the project quality. Developing a system based on ICT in remote education systems, and knowledge management, it enables more efficient training of specialists, in order to get results in less time, within budget and with the quality required by stakeholders. The research aims to develop a procedure for decision-making through a discussion forum, using ICT and project cuts. That project cuts reflects the status of the indicators and enable search for the causes of the damages on tasks, identify the effect on the project and analyze the damages and synthesis in an integrated process. It also enables navigation and simulation of possible solutions, select the best and proceed to decision-making. Research show the indicators for decision-making, navigation, simulation, evaluation and forum example of the Master of Project Management.
引用
收藏
页码:114 / 123
页数:10
相关论文
共 15 条
[1]  
[Anonymous], 2012, ISO 21500
[2]  
Bath M., 2010, INT C ADV COMPUTING, P537
[3]   A Synthetic Measure for the Assessment of the Project Performance [J].
Certa, Antonella ;
Enea, Mario ;
Giallanza, Antonio .
BUSINESS PERFORMANCE MEASUREMENT AND MANAGEMENT: NEW CONTEXTS, THEMES AND CHALLENGES, 2010, :167-180
[4]  
CMMI Capability Maturity Model Integration for Development, 2010, TECHNICAL REPORT
[5]  
Cooperberg A. F., 2002, RED REV ED DISTANCIA
[6]  
Delgado R., 2011, DIRECCION INTEGRADA
[7]  
Gao H, 2010, PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, P273, DOI 10.1109/ICLSIM.2010.5461423
[8]  
Garcia J., 2005, REV IBEROAMERICANA E
[9]  
Govindarajan A., 2014, TELKOMNIKA INDONESIA, V12, P7054
[10]  
Kelemen A., 2002, RECENT ADV SIMULATIO, P181