共 15 条
[1]
[Anonymous], 2012, ISO 21500
[2]
Bath M., 2010, INT C ADV COMPUTING, P537
[3]
A Synthetic Measure for the Assessment of the Project Performance
[J].
BUSINESS PERFORMANCE MEASUREMENT AND MANAGEMENT: NEW CONTEXTS, THEMES AND CHALLENGES,
2010,
:167-180
[4]
CMMI Capability Maturity Model Integration for Development, 2010, TECHNICAL REPORT
[5]
Cooperberg A. F., 2002, RED REV ED DISTANCIA
[6]
Delgado R., 2011, DIRECCION INTEGRADA
[7]
Gao H, 2010, PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, P273, DOI 10.1109/ICLSIM.2010.5461423
[8]
Garcia J., 2005, REV IBEROAMERICANA E
[9]
Govindarajan A., 2014, TELKOMNIKA INDONESIA, V12, P7054
[10]
Kelemen A., 2002, RECENT ADV SIMULATIO, P181