Research on the risk management of Harbin metro project
被引:0
作者:
Zhang Dequn
论文数: 0引用数: 0
h-index: 0
机构:
Harbin Inst Technol, Harbin 150006, Peoples R ChinaHarbin Inst Technol, Harbin 150006, Peoples R China
Zhang Dequn
[1
]
Wang Huimo
论文数: 0引用数: 0
h-index: 0
机构:
Harbin Inst Technol, Harbin 150006, Peoples R ChinaHarbin Inst Technol, Harbin 150006, Peoples R China
Wang Huimo
[1
]
机构:
[1] Harbin Inst Technol, Harbin 150006, Peoples R China
来源:
Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE
|
2006年
关键词:
metro project;
risk identification;
risk analysis;
risk management;
D O I:
暂无
中图分类号:
F8 [财政、金融];
学科分类号:
0202 ;
摘要:
There are a large number of uncertain risky factors in the metro project as a large city engineering project. The management of these risky factors are directly linked with the materialization of the construction of the metro project. This article articulates in details the identification of risky factors in the metro project, the risk analysis and the risk management. It analyzes in details the possible risky factors in the Harbin metro project to start, and points out problems to be noticed and matching solutions.