Creep and shrinkage effects in service stresses of concrete cable-stayed bridges

被引:20
作者
Antonio Lozano-Galant, Jose [1 ]
Turmo, Jose [2 ]
机构
[1] Univ Castilla La Mancha, Dept Civil Engn, E-13071 Ciudad Real, Spain
[2] Univ Politecn Cataluna, BarcelonaTech, Dept Construct Engn, E-08028 Barcelona, Spain
关键词
cable-stayed bridge; time-dependent phenomena; creep; shrinkage; concrete; service stresses; NONLINEAR-ANALYSIS; OPTIMIZATION; ALGORITHM; FORCES;
D O I
10.12989/cac.2014.13.4.483
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Most of the methods presented in the literature to define the target service stresses (Objective Service Stage, OSS) of cable-stayed bridges rarely include the time-dependent phenomena effects. Nevertheless, especially in concrete structures, this assumption might be on the unsafe side because time-dependent phenomena usually modify service stresses. To fill this gap, this paper studies the time-dependent phenomena effects into service stresses of concrete cable-stayed bridges. After illustrating the important role of these phenomena in an asymmetrical cable-stayed bridge without backstay, a new method to include their effects into the OSS is presented. An important issue to be considered in this method is the target time in which the OSS is defined to be achieved. The application of this method to two different structures showed the convenience of defining the OSS to be achieved at early times because that way the envelope of service stresses is reduced.
引用
收藏
页码:483 / 499
页数:17
相关论文
共 33 条
[1]  
[Anonymous], 2001, HAUB REC COMM INT PR
[2]  
Au FTK, 2012, STRUCT ENG MECH, V41, P139
[3]   Accurate time-dependent analysis of concrete bridges considering concrete creep, concrete shrinkage and cable relaxation [J].
Au, Francis T. K. ;
Si, X. T. .
ENGINEERING STRUCTURES, 2011, 33 (01) :118-126
[4]  
Barros HFM, 2012, COMPUT CONCRETE, V10, P541
[5]  
Bazant Z., 1998, Mathematical modeling of creep and shrinkage of concrete
[6]   Monitoring of the Alamillo cable-stayed bridge during construction [J].
Casas, JR ;
Aparicio, AC .
EXPERIMENTAL MECHANICS, 1998, 38 (01) :24-28
[7]   Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method [J].
Chen, DW ;
Au, FTK ;
Tham, LG ;
Lee, PKK .
COMPUTERS & STRUCTURES, 2000, 74 (01) :1-9
[8]   Analysis of concrete cable-stayed bridges for creep, shrinkage and relaxation effects [J].
Cluley, NC ;
Shepherd, R .
COMPUTERS & STRUCTURES, 1996, 58 (02) :337-350
[9]  
Du G.H., 1989, BRIDGE CONSTRUCT, V74, P18
[10]  
Fiore A, 2012, COMPUT CONCRETE, V9, P357