A genetic algorithm for a re-entrant job-shop scheduling problem with sequence-dependent setup times

被引:17
|
作者
Sun, J. U. [1 ]
机构
[1] Hankuk Univ Foreign Studies, Sch Ind & Management Engn, Yonsin Shi 449791, Kyonggi Do, South Korea
关键词
job-shop scheduling; re-entrant work flows; sequence-dependent setup; genetic algorithm; Taguchi method; UP TIMES; TUTORIAL SURVEY; PERFORMANCE; MACHINES; DATES;
D O I
10.1080/03052150802613335
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article addresses a re-entrant job-shop scheduling problem with sequence-dependent setup times. The disjunctive graph model with the objective of the minimum makespan is used to capture the interactions between machines. On the basis of this representation, two heuristic procedures and a genetic algorithm are proposed to obtain near-optimal solutions for this problem. Also, an experimental design method for determining the various genetic parameters based on the Taguchi approach is presented. A comparative study is conducted to examine the performance of these proposed algorithms and the results show that the genetic algorithm outperforms the other heuristic procedures, which are modified versions of recently published existing methods.
引用
收藏
页码:505 / 520
页数:16
相关论文
共 50 条
  • [21] A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups
    Fantahun M. Defersha
    Mingyuan Chen
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 263 - 279
  • [22] A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups
    Defersha, Fantahun M.
    Chen, Mingyuan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (1-4): : 263 - 279
  • [23] A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times
    Sioud, A.
    Gravel, M.
    Gagne, C.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (10) : 2415 - 2424
  • [24] An improved genetic algorithm for Job-shop scheduling problem
    Lou Xiao-fang
    Zou Feng-xing
    Gao Zheng
    Zeng Ling-li
    Ou Wei
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2595 - +
  • [25] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [26] AN IMPROVED GENETIC ALGORITHM FOR JOB-SHOP SCHEDULING PROBLEM WITH PROCESS SEQUENCE FLEXIBILITY
    Huang, X. W.
    Zhao, X. Y.
    Ma, X. L.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2014, 13 (04) : 510 - 522
  • [27] Genetic Algorithm for Solving Job-Shop Scheduling Problem
    Li XiaoBo
    2011 AASRI CONFERENCE ON INFORMATION TECHNOLOGY AND ECONOMIC DEVELOPMENT (AASRI-ITED 2011), VOL 1, 2011, : 296 - 298
  • [28] Improved genetic algorithm for the job-shop scheduling problem
    Tung-Kuan Liu
    Jinn-Tsong Tsai
    Jyh-Horng Chou
    The International Journal of Advanced Manufacturing Technology, 2006, 27 : 1021 - 1029
  • [29] Genetic Algorithm for Solving Job-Shop Scheduling Problem
    Li XiaoBo
    2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL IV, 2011, : 296 - 298
  • [30] Improved genetic algorithm for the job-shop scheduling problem
    Liu, TK
    Tsai, JT
    Chou, JH
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 27 (9-10): : 1021 - 1029