The effectiveness of an integrated BIM/UAV model in managing safety on construction sites

被引:93
作者
Alizadehsalehi, Sepehr [1 ,3 ]
Yitmen, Ibrahim [1 ,4 ]
Celik, Tolga [1 ]
Arditi, David [2 ]
机构
[1] Eastern Mediterranean Univ, Civil Engn Dept, Famagusta, Turkey
[2] IIT, Dept Civil & Architectural Engn, Chicago, IL 60616 USA
[3] Northwestern Univ, Dept Civil & Environm Engn, Evanston, IL 60208 USA
[4] Jonkoping Univ, Dept Construct Engn & Lighting Sci, Jonkoping, Sweden
关键词
construction safety management; four-dimensional visualization; building information modeling; unmanned aerial vehicles; UNMANNED AERIAL VEHICLES; MANAGEMENT; HEALTH; PREVENTION; SYSTEM; BIM; IDENTIFICATION; INDUSTRY; TECHNOLOGIES; CHECKING;
D O I
10.1080/10803548.2018.1504487
中图分类号
TB18 [人体工程学];
学科分类号
1201 ;
摘要
Introduction. A variety of approaches exist to achieve better construction safety performance, but only a few consider a combination of building information modeling (BIM) and unmanned aerial vehicles (UAVs). Method. This article presents a four-dimensional (4D) BIM/UAV-enabled safety management model based on IDEF0 language. In the first step, potential hazards are identified with the help of safety specialists' experiences and BIM software used in the design of the structure. Then, a UAV monitors the location of the potential hazards. The third step involves the integration of the 4D BIM-based model and the information obtained from the UAV. Finally, the combined data are analyzed and interpreted, and site safety staff are notified about measures to be put in place to prevent accidents. Results. This model shows a strong relationship between the design and construction phases by using BIM in the design phase and UAVs in the construction phase. The proposed safety model was evaluated by construction safety specialists in a two-pronged approach. Conclusion. The number of fatal, non-fatal and property damage-causing accidents may be significantly lower when the proposed system was used. Practical application. This model allows safety specialists to identify hazards and develop suitable mitigation strategies.
引用
收藏
页码:829 / 844
页数:16
相关论文
共 87 条
[11]   A proactive system for real-time safety management in construction sites [J].
Carbonari, Alessandro ;
Giretti, Alberto ;
Naticchia, Berardo .
AUTOMATION IN CONSTRUCTION, 2011, 20 (06) :686-698
[12]   Application of RFID technology to prevention of collision accident with heavy equipment [J].
Chae, Soungho ;
Yoshida, Tomohiro .
AUTOMATION IN CONSTRUCTION, 2010, 19 (03) :368-374
[13]  
Chantawit D., 2005, Construction Innovation, V5, P99, DOI 10.1191/1471417505ci091oa
[14]   Construction safety planning: Site-specific temporal and spatial information integration [J].
Choe, Sooyoung ;
Leite, Fernanda .
AUTOMATION IN CONSTRUCTION, 2017, 84 :335-344
[15]  
Choe SY, 2014, J INF TECHNOL CONSTR, V19, P1
[16]  
Eschmann C., 2012, P 6 EUR WORKSH STRUC
[17]  
Fiorillo F, 2013, VIRTUAL ARCHAEOL REV, V4, P55
[18]   UAV-based urban structural damage assessment using object-based image analysis and semantic reasoning [J].
Galarreta, J. Fernandez ;
Kerle, N. ;
Gerke, M. .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2015, 15 (06) :1087-1101
[19]   Design's role in construction accident causality and prevention: Perspectives from an expert panel [J].
Gambatese, John A. ;
Behm, Michael ;
Rajendran, Sathyanarayanan .
SAFETY SCIENCE, 2008, 46 (04) :675-691
[20]   Integrating Building Information Modeling and Health and Safety for Onsite Construction [J].
Ganah, Abdulkadir ;
John, Godfaurd A. .
SAFETY AND HEALTH AT WORK, 2015, 6 (01) :39-45