Intelligence approach to production planning system for bespoke precast concrete products

被引:42
作者
Benjaoran, Vacharapoom [1 ]
Dawood, Nashwan
机构
[1] Ubon Rajathanee Univ, Dept Civil Engn, Ubon Ratchathani 34190, Thailand
[2] Univ Teesside, Ctr Construct Innovat Res, Middlesbrough TS1 3BA, Cleveland, England
关键词
precast concrete products; production planning; artificial intelligence; offsite prefabrication;
D O I
10.1016/j.autcon.2005.09.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bespoke precast concrete products are widely used components of construction projects. These products implement the offsite prefabrication technology that offers a unique opportunity for innovation and cost savings for construction projects. However, the production process from design to manufacturing contains uncertainties due to external factors: multi-disciplinary design, progress on construction site. The typical workload on bespoke precast factories is a complex combination of uniquely and identically designed products, which have various delivery dates and requirement of costly purpose-built moulds. In this context, this research is aimed to improve the efficiency of the process by addressing the production planning because it has a significant impact to the success of the production programme. An innovative planning system and its prototype called 'Artificial Intelligence Planner' (AIP) are developed. AIP is capable of two functionalities. The first is a data integration system that encourages the automation in the planning process. The other is a decision support system for planners to improve the efficiency of the production plans. These functionalities reinforce each other to deliver optimum benefits to precast manufacturers. AIP have employed artificial intelligence technologies: neural network and genetic algorithm to enhance data analyses for being a decision support for production planning. The outcomes of the research include shortened customer lead-time, in-house repository of production knowledge, and achievement of the optimum factory's resource utilisation. (C) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:737 / 745
页数:9
相关论文
共 21 条
[1]   Estimating labor production rates for industrial construction activities [J].
AbouRizk, S ;
Knowles, P ;
Hermann, UR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06) :502-511
[2]  
BENJAORAN V, 2003, P 11 IGLC BLACKSB VI
[3]  
BENJAORAN V, 2004, P 20 ARCOM ED SCOTL
[4]   Flowshop scheduling model for bespoke precast concrete production planning [J].
Benjaoran, Vacharapoom ;
Dawood, Nashwan ;
Hobbs, Brian .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (01) :93-105
[5]   Production scheduling for precast plants using a flow shop sequencing model [J].
Chan, WT ;
Hu, H .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (03) :165-174
[6]   ESTIMATING CONSTRUCTION PRODUCTIVITY - NEURAL-NETWORK-BASED APPROACH [J].
CHAO, LC ;
SKIBNIEWSKI, MJ .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1994, 8 (02) :234-251
[7]  
KARSTILA K, 2003, IN PRESS IA ST 3 PRE
[8]  
KIM W, 2002, P 4 ECPPM SLOV, P457
[9]   Optimal repetitive scheduling model with shareable resource constraint [J].
Leu, SS ;
Hwang, ST .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (04) :270-280
[10]  
Miles J., 2001, APPL REGRESSION CORR