The Aspo pillar stability experiment: Part I-Experiment design

被引:74
作者
Andersson, J. Christer [1 ]
Martin, C. Derek [2 ]
机构
[1] SKB Aspo Hard Rock Lab, Aspo, Sweden
[2] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB, Canada
关键词
Nuclear waste; Acoustic emission; SKB; Stress; Fracturing; Confinement; Rock mass strength; Numeric modeling; Spalling; APSE; Aspo HRL; Pillar; FRACTURE;
D O I
10.1016/j.ijrmms.2009.02.010
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Aspo pillar stability experiment was carried out to examine the failure process in a heterogeneous and fractured rock mass when subjected to coupled excavation-induced and thermal-induced stresses. The rock pillar was created by the excavation of two adjacent large-diameter boreholes. The pillar was loaded by a combination of excavation-induced stresses and heating of the surrounding rock by a rectangular heater pattern. The experiment was designed using the observation design method. The characterzation of the experiment volume showed that the experiment was located in a fractured water-bearing rock mass that was considered typical for the Aspo Hard Rock Laboratory (Aspo HRL) and for the Fenno-Scandinavian shield. Scoping calculations using two- and three-dimensional elastic stress analyses were carried out to reduce the uncertainty for the far-field in-situ stresses, establish the geometry for the access tunnel that would provide a elevated uniform stresses in the floor of the tunnel, and determine the optimum width of the pillar. It was concluded, based on the rock mass characteristics, that a 1 m-wide pillar formed by two 1.75 m diameter boreholes would meet the design objectives. Thermal modelling showed that thermally induced stresses in the pillar were adequate to elevate the pillar stresses above the stress magnitude required to initiate failure. Acoustic emission, displacement, and thermal monitoring systems were installed according to the experiment design without problems. No sensors were lost over the three month duration. After the experiment was completed, a laser scan of the pillar revealed the extent of the damaged pillar. The experiment commenced in January 2002 and was successfully completed in 2006. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:865 / 878
页数:14
相关论文
共 27 条
  • [1] Andersson C, 2003, ROCK STRESS, P321
  • [2] ANDERSSON J, 2003, P GEOPR 2003 STOCKH, P385
  • [3] ANDERSSON JC, 2002, TR0226 SKB
  • [4] ANDERSSON JC, INT J ROCK MEC UNPUB
  • [5] ANDERSSON JC, 2002, P NARMS TAC 2002 5 N, P1187
  • [6] ANDERSSON JC, 2007, 1008 TRITAJOB PHD
  • [7] [Anonymous], 1988, INT J ROCK MECH MIN, V25, P71
  • [8] Rock fracture toughness testing in Mode II - punch-through shear test
    Backers, T
    Stephansson, O
    Rybacki, E
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2002, 39 (06) : 755 - 769
  • [9] BARTON N, 2003, IPR0407 SKB
  • [10] Brown ET, 1981, BIOSPECTROSCOPY, V4, P107