Scheduling of unrelated parallel machines when machine availability is specified

被引:8
|
作者
Suresh, V [1 ]
Chaudhuri, D [1 ]
机构
[1] KUWAIT INST SCI RES,ECON POLICY & PLANNING DEPT,TECHNO ECON DIV,SAFAT 13109,KUWAIT
关键词
machine scheduling; unrelated parallel; vacations; probabilistic;
D O I
10.1080/09537289608930367
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling problems typically assume uninterrupted availability of machines such that jobs can be processed at any time during this uninterrupted period. However, this assumption is seldom valid in reality. For a variety of reasons, e.g. machine adjustments, shift changes, planned maintenance, etc. machines are available only at specified times. The duration for which the machine is not available is known as the vacation. This paper considers the problem of scheduling jobs on unrelated parallel machines when machine vacations are specified. Two cases are considered, first, when the machine vacations are known a priori, and the second, when these constraints are not known a priori. Algorithms have been developed for both models, and computational results are also reported.
引用
收藏
页码:393 / 400
页数:8
相关论文
共 50 条
  • [11] Scheduling with job rejection and nonsimultaneous machine available time on unrelated parallel machines
    Jiang, Dakui
    Tan, Jiayin
    THEORETICAL COMPUTER SCIENCE, 2016, 616 : 94 - 99
  • [12] MULTI-OBJECTIVE SCHEDULING BY MAXIMIZING MACHINE PREFERENCES FOR UNRELATED PARALLEL MACHINES
    Saricicek, Inci
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2020, 38 (01): : 405 - 420
  • [13] Multiobjective Order Acceptance and Scheduling on Unrelated Parallel Machines with Machine Eligibility Constraints
    Wang, Bailin
    Wang, Haifeng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [14] A Unified Approach to Scheduling on Unrelated Parallel Machines
    Kumar, V. S. Anil
    Marathe, Madhav V.
    Parthasarathy, Srinivasan
    Srinivasan, Aravind
    JOURNAL OF THE ACM, 2009, 56 (05)
  • [15] APPROXIMATION ALGORITHMS FOR SCHEDULING UNRELATED PARALLEL MACHINES
    LENSTRA, JK
    SHMOYS, DB
    TARDOS, E
    MATHEMATICAL PROGRAMMING, 1990, 46 (03) : 259 - 271
  • [16] Energy Aware Scheduling for Unrelated Parallel Machines
    Angel, Eric
    Bampis, Evripidis
    Kacem, Fadi
    2012 IEEE INTERNATIONAL CONFERENCE ON GREEN COMPUTING AND COMMUNICATIONS, CONFERENCE ON INTERNET OF THINGS, AND CONFERENCE ON CYBER, PHYSICAL AND SOCIAL COMPUTING (GREENCOM 2012), 2012, : 533 - 540
  • [17] Bicriteria scheduling problem for unrelated parallel machines
    Suresh, V
    Chaudhuri, D
    COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (01) : 77 - 82
  • [18] Scheduling unrelated parallel machines computational results
    Monien, Burkhard
    Woclaw, Andreas
    EXPERIMENTAL ALGORITHMS, PROCEEDINGS, 2006, 4007 : 195 - 206
  • [19] The Unrelated Parallel Machines Scheduling Problem with Machine and Job Dependent Setup Times, Availability Constraints, Time Windows and Maintenance Times
    Agardi, Anita
    Nehez, Karoly
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2021, 12 (03) : 15 - 24
  • [20] Scheduling unrelated parallel machines with optional machines and jobs selection
    Fanjul-Peyro, Luis
    Ruiz, Ruben
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1745 - 1753