On the integration of due date setting and order release control

被引:13
作者
Thurer, Matthias [1 ]
Land, Martin J. [2 ]
Stevenson, Mark [3 ]
Fredendall, Lawrence D. [4 ]
机构
[1] Jinan Univ, Inst Phys Internet, Sch Elect & Informat Engn, Guangzhou, Guangdong, Peoples R China
[2] Univ Groningen, Fac Econ & Business, Dept Operat, Groningen, Netherlands
[3] Univ Lancaster, Sch Management, Dept Management Sci, Lancaster, England
[4] Clemson Univ, Dept Management, Clemson, SC 29634 USA
基金
中国国家自然科学基金;
关键词
Due date setting; order release; workload control; simulation; WORKLOAD CONTROL CONCEPTS; JOB-SHOP ENVIRONMENT; CONTROL WLC; PERFORMANCE; COMPANIES; SYSTEM; COBACABANA; INPUT;
D O I
10.1080/09537287.2017.1302102
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper calls for a paradigm shift in the production control literature away from assuming due date setting and order release are two independent decision levels. When order release is controlled, jobs do not enter the shop floor directly but are retained in a pre-shop pool and released to meet certain performance targets. This makes the setting of accurate planned release dates - the point at which jobs transition from the pool to the shop floor - a key consideration when setting due dates. We develop a new approach to estimating planned release dates to be embedded in the Workload Control (WLC) concept. Our approach is unique as it anticipates the release decision as part of the due date setting procedure. This makes a second independent release decision superfluous and avoids a major cause of tardiness - deviations between (i) the planned release date used when calculating the delivery time allowance and (ii) the actual, realised release date. Simulation is used to compare the performance of WLC using two decision levels with the new single-level approach where the release decision is anticipated when setting the due date. Performance improvements are shown to be robust to uncertainty in processing time estimates.
引用
收藏
页码:420 / 430
页数:11
相关论文
共 41 条
[1]   DUE DATE ASSIGNMENT, JOB ORDER RELEASE, AND SEQUENCING INTERACTION IN JOB SHOP SCHEDULING [J].
AHMED, I ;
FISHER, WW .
DECISION SCIENCES, 1992, 23 (03) :633-647
[2]   LOAD-ORIENTED MANUFACTURING CONTROL JUST-IN-TIME PRODUCTION FOR JOB SHOPS [J].
BECHTE, W .
PRODUCTION PLANNING & CONTROL, 1994, 5 (03) :292-307
[3]   Order review and release strategies in a job shop environment: A review and a classification [J].
Bergamaschi, D ;
Cigolini, R ;
Perona, M ;
Portioli, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) :399-420
[4]  
Bertrand J.W.M., 1983, J OPER MANAG, V3, P79
[5]  
Bertrand J.W.M., 1981, Production control and information systems for component-manufacturing shops
[6]   THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE [J].
BERTRAND, JWM .
MANAGEMENT SCIENCE, 1983, 29 (07) :799-816
[7]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[8]   An experimental investigation on workload limiting methods within ORR policies in a job shop environment [J].
Cigolini, R ;
Portioli-Staudacher, A .
PRODUCTION PLANNING & CONTROL, 2002, 13 (07) :602-613
[9]   A DYNAMIC FORECASTING-MODEL FOR JOB-SHOP FLOWTIME PREDICTION AND TARDINESS CONTROL [J].
ENNS, ST .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (05) :1295-1312
[10]   AN INTEGRATED SYSTEM FOR CONTROLLING SHOP LOADING AND WORK FLOW [J].
ENNS, ST .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (10) :2801-2820