The risk element transmission theory research of multi-objective risk-time-cost trade-off

被引:11
作者
Li, Cunbin [1 ]
Wang, Kecheng [1 ]
机构
[1] N China Elect Power Univ, Inst Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple objective optimization; Markov processes; RBF neural network; Risk element; Transmission; ADAPTIVE PATTERN-CLASSIFICATION; NETWORKS; PATH;
D O I
10.1016/j.camwa.2008.10.051
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Risk management project is an important aspect of general project risk element transmission theory. To solve the multi-objective time-cost trade-off problem considering the risk elements effectively, this paper establishes an analytical model for multi-objective risk-time-cost trade-off problem based on general project risk element transmission theory. We divide risk elements into discrete model and continuous model to be discussed separately, and the two models for multi-objective risk-time-cost trade-off problem are established by taking Markov dynamic PERT network into classical PERT network. Thus, we combine Radial Basis Function (RBF) neural network to solve the discrete model of the problem. Finally, a practical example illustrates the effectiveness of the algorithm. Crown Copyright (C) 2008 Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1792 / 1799
页数:8
相关论文
共 17 条
[1]  
[Anonymous], P INT JOINT C NEUR N, DOI DOI 10.1109/IJCNN.1989.118638
[2]  
[Anonymous], P NATL ACAD SCI US
[3]  
[Anonymous], MATH BASIS SEP
[4]  
[Anonymous], MANAGEMENT SCI JUL
[5]  
[Anonymous], J EC WATER RESOURCES
[6]  
[Anonymous], MANAGE SCI
[7]   Distribution function of the shortest path in networks of queues [J].
Azaron, A ;
Modarres, M .
OR SPECTRUM, 2005, 27 (01) :123-144
[8]   Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach [J].
Azaron, Amir ;
Tavakkoli-Moghaddam, Reza .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) :1186-1200
[9]   RESOURCE-ALLOCATION IN A PERT NETWORK UNDER CONTINUOUS ACTIVITY TIME-COST FUNCTIONS [J].
BERMAN, EB .
MANAGEMENT SCIENCE, 1964, 10 (04) :734-745
[10]   CRITICAL PATH PROBLEMS WITH CONCAVE COST-TIME CURVES [J].
FALK, JE ;
HOROWITZ, JL .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1972, 19 (04) :446-455