An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy

被引:10
作者
Kuhn, Heinrich [1 ]
Liske, Thomas [1 ]
机构
[1] Catholic Univ Eichstaett Ingolstadt, D-85049 Ingolstadt, Germany
关键词
Lot sizing; Scheduling; Inventory; Production; Vehicle routing; ELSSP; JOINT REPLENISHMENT; GENETIC ALGORITHM; INVENTORY; MULTIPRODUCT; TRANSPORTATION; COORDINATION; VENDOR; MODELS;
D O I
10.1016/j.cor.2014.04.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
It is not sufficient for a manufacturer of products to merely optimize lot sizes and production schedules to reduce company-wide costs. Optimal policies for raw materials purchasing, stock keeping of input material, inventory management of end products and customer demand fulfillment also have to be implemented in an integrated manner. The economic lot and supply scheduling problem (ELSSP) deals with the problem of the simultaneous planning of raw materials purchasing, production planning and storage of finished goods. The underlying assumptions of an ELSSP can be observed in several industrial areas, e.g., the retailing and automotive industries. After a brief problem description and a literature review, this paper presents a complete mathematical model and an exact procedure to solve the ELSSP using a power-of-two policy. The solution procedure is based on the junction point method. Analytical results for a broad range of test instances are calculated comparing the results of a power-of-two policy to the results from applying a common cycle policy. The results emphasize the economic advantages of the power-of-two policy especially for certain parameter values. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:30 / 40
页数:11
相关论文
共 52 条
[1]   Industrial aspects and literature survey: Combined inventory management and routing [J].
Andersson, Henrik ;
Hoff, Arild ;
Christiansen, Marielle ;
Hasle, Geir ;
Lokketangen, Arne .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) :1515-1536
[2]   ONE WAREHOUSE MULTIPLE RETAILER SYSTEMS WITH VEHICLE-ROUTING COSTS [J].
ANILY, S ;
FEDERGRUEN, A .
MANAGEMENT SCIENCE, 1990, 36 (01) :92-114
[3]  
[Anonymous], 1975, INT J PROD RES
[4]  
[Anonymous], 2002, VEHICLE ROUTING PROB, DOI DOI 10.1137/1.9780898718515
[5]   Simultaneous determination of multiproduct batch and full truckload shipment schedules [J].
Banerjee, Avijit .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) :111-117
[6]   The joint economic lot sizing problem: Review and extensions [J].
Ben-Daya, M. ;
Darwish, M. ;
Ertogral, K. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) :726-742
[7]   ANALYZING TRADE-OFFS BETWEEN TRANSPORTATION, INVENTORY AND PRODUCTION COSTS ON FREIGHT NETWORKS [J].
BLUMENFELD, DE ;
BURNS, LD ;
DILTZ, JD ;
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1985, 19 (05) :361-380
[8]  
Bomberger EarlE., 1966, Management Science, V12, P778, DOI [https://doi.org/10.1287/mnsc.12.11.778, DOI 10.1287/MNSC.12.11.778]
[9]   DISTRIBUTION STRATEGIES THAT MINIMIZE TRANSPORTATION AND INVENTORY COSTS [J].
BURNS, LD ;
HALL, RW ;
BLUMENFELD, DE ;
DAGANZO, CF .
OPERATIONS RESEARCH, 1985, 33 (03) :469-490
[10]  
Campbell A., 1998, INVENTORY ROUTING PR, p95