Reliability Evaluation and Weak Component Identification of ±500-kV HVDC Transmission Systems With Double-Circuit Lines on the Same Tower

被引:19
|
作者
Hu, Bo [1 ]
Xie, Kaigui [1 ]
Tai, Heng-Ming [2 ]
机构
[1] Chongqing Univ, State Key Lab Power Transmiss Equipment & Syst Se, Chongqing 400030, Peoples R China
[2] Univ Tulsa, Dept Elect & Comp Engn, Tulsa, OK 74104 USA
基金
中国国家自然科学基金;
关键词
HVdc transmission system with double-circuit lines on the same tower (DCLST); reliability evaluation; reliability index; unreliability allocation model; weak component identification; ADEQUACY ASSESSMENT; POWER-SYSTEMS; UNRELIABILITY; PERFORMANCE; VALVE; LINKS;
D O I
10.1109/TPWRD.2017.2768444
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, a reliability evaluation model and a bilevel unreliability allocation model for the +/- 500-kV HVdc transmission system with the double-circuit lines on the same tower (DCLST) are proposed. The reliability evaluation indices associated with this DCLST HVdc system are also defined. The reliability model is based on the characteristics of common starting point and terminal point structure and double-circuit HVdc coordination operation. And it is developed by integrating HVdc subsystem reliability models together. A multistate Markov model for the dc line (DCL) subsystem is built by considering the common-cause outage of four DCLs on the same tower. The reliability evaluation model of the ac filter (ACF) subsystem is constructed by considering the derated capacity operation state caused by ACF failures. On the other hand, a bilevel unreliability allocation model is constructed based on the proportion-allocation criterion. The allocation model is embedded into the reliability evaluation model so that all reliability indices can be allocated to each component after only one reliability evaluation calculation. As a result, the impact of each component on the system reliability and weak components of the system can be explicitly and unambiguously identified. An actual +/- 500-kV HVdc transmission project with the DCLST is used for case study to validate the effectiveness of the proposed models and indices.
引用
收藏
页码:1716 / 1726
页数:11
相关论文
共 50 条
  • [11] A Novel Protection of Transmission Lines for Two ±500kV HVDC Systems Erected on the Same Tower
    Huang Min
    Wang Gang
    Luo Huihui
    Liang Yuansheng
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 3669 - 3674
  • [12] Development of a novel dynamic physical model for double-circuit transmission lines on the same tower
    Xia, Yongjun
    Zhang, Zhe
    Liu, Yi
    Yin, Xianggen
    Hu, Gang
    Zhang, Kanjun
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2010, 34 (21): : 61 - 64
  • [13] New scheme on reclosing phase by phase for double-circuit transmission lines on the same tower
    Liu, Jia-Jun
    Liang, Zhen-Feng
    Zhang, Xin-Wei
    Wang, De-Yi
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (05): : 22 - 25
  • [14] Numerical analysis of potential distribution of porcelain insulator strings for 750 kV double-circuit transmission lines on the same tower
    Liu, Yu-Gen
    Tian, Jin-Hu
    Liu, Xiao-Wei
    Cheng, Xi
    Xiao, Lei-Shi
    Gaodianya Jishu/High Voltage Engineering, 2010, 36 (07): : 1644 - 1650
  • [15] The analysis of Body Surface Electric Field during Live Working on 500kV double-circuit lines on same tower
    Liu, Xiaqin
    Yang, Qi
    Li, Hui
    Chen, Jianping
    Li, Jinliang
    Xu, Li
    2016 IEEE INTERNATIONAL CONFERENCE ON HIGH VOLTAGE ENGINEERING AND APPLICATION (ICHVE), 2016,
  • [16] Design of 500 kV AC double-circuit transmission line on the same tower located at 20 mm heavy icing area
    Zhang, Haiping
    Zhang, Chi
    Wang, Jiangtao
    Zhao, Qingbin
    Ren, Deshun
    Gou, Jie
    Dianwang Jishu/Power System Technology, 2015, 39 (01): : 123 - 129
  • [17] Research on the Selection Method of Phase Sequence Arrangement of Double-circuit Transmission Lines on the Same Tower
    Zhou, Ning
    Shu, Zhan
    Su, Yongchun
    Chen, Bo
    Cheng, Zheng
    2016 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2016, : 2592 - 2596
  • [18] Research on Induced voltage and Current in Deenergized Line of Double-Circuit Transmission Lines on the Same Tower
    Tian, Wu
    Cao, Zhibo
    2019 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT GREEN BUILDING AND SMART GRID (IGBSG 2019), 2019, : 264 - 269
  • [19] A Practical Fault Phase Selection Scheme for Untransposed Double-circuit Transmission Lines on the Same Tower
    Zhang, Shifeng
    Hao, Zhiguo
    Chao, Guang
    Huang, Mingyu
    Bo, Zhiqian
    2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014, : 788 - 793