The complexity of cyclic shop scheduling problems

被引:27
作者
Hall, NG
Lee, TE
Posner, ME
机构
[1] Ohio State Univ, Dept Management Sci, Columbus, OH 43210 USA
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Yusong Gu, Taejon 305701, South Korea
关键词
manufacturing; cyclic scheduling; sequencing; algorithms and complexity;
D O I
10.1002/jos.100
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider scheduling problems for shops in which a job set is manufactured repetitively. Jobs are scheduled to minimize the cycle time of the job set, which is equivalent to maximizing the throughput rate. We characterize the complexity of the scheduling problem for several types of job shops. Polynomial time algorithms are presented for open shops, and for job shops where each job has at most two operations. When there are two machines and the maximum number of operations of any job is a constant k greater than or equal to 3, the recognition version of the job shop problem is shown to be binary NP-complete. We describe a pseudopolynomial time algorithm for a special case of the problem when k = 3. We also establish that some generalizations of this problem are unary NP-complete. One consequence of these results is that the recognition version of the two machine job shop makespan problem with at most five operations per job is unary NP-complete. This resolves a question posed by Lenstra et al. (Ann. Discrete Math. 1977; 1:343). More generally, our results provide a map of the computational complexity of cycle time minimization problems that is analogous to that in the literature for makespan problems. Copyright (C) 2002 John Wiley Sons, Ltd.
引用
收藏
页码:307 / 327
页数:21
相关论文
共 25 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
CARLIER J, 1990, 2 INT WORKSH PROJ MA
[3]  
Chaar J. K., 1990, Proceedings 1990 IEEE International Conference on Robotics and Automation (Cat. No.90CH2876-1), P2128, DOI 10.1109/ROBOT.1990.126319
[4]  
CLAVER JF, 1987, 736 CORN U SCH OP RE
[5]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[6]   SHORT-TERM PRODUCTION SCHEDULING OF AN AUTOMATED MANUFACTURING FACILITY [J].
GERSHWIN, SB ;
AKELLA, R ;
CHOONG, YF .
IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1985, 29 (04) :392-400
[7]   FLOW-SHOP AND JOB-SHOP SCHEDULES - COMPLEXITY AND APPROXIMATION [J].
GONZALEZ, T ;
SAHNI, S .
OPERATIONS RESEARCH, 1978, 26 (01) :36-52
[8]  
Graham R. L., 1979, Discrete Optimisation, P287
[9]  
GRAVES SC, 1983, J OPERATIONS MANAGEM, V3, P197, DOI DOI 10.1016/0272-6963(83)90004-9
[10]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525