Integrated risk management process for building projects

被引:5
作者
Toth, Tamas [1 ]
Sebestyen, Zoltan [1 ]
机构
[1] Budapest Univ Technol & Econ, Magyar Tudosok Korutja 2 QA307, H-1117 Budapest, Hungary
来源
CREATIVE CONSTRUCTION CONFERENCE 2014 | 2014年 / 85卷
关键词
automation of risk management; construction project; financial risk management; project success criteria;
D O I
10.1016/j.proeng.2014.10.578
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The objective of this paper is to provide an integrated risk analysis method for building projects which tracks the probabilities of the occurrences of harmful events perceived by the owners from the conceptual phase to the end of the project. The risk management framework is built on traditional risk modeling bases and integrated with financial aspects. This extension of the original concepts defines the project goal by the minimum requirements to be achieved, then objectively identifies risk factors with measurable financial variables. The contribution to the current body of knowledge is threefold. On the one hand, from a project management point of view, the emphasis on the definition of project objectives shifted towards meeting financial goals by integrating relationships of financial minimum expectations at the model level. On the other hand, from a financial aspect, the opportunity of continuous monitoring and reassessment for risk management processes is created. Finally, based on this framework an automatized risk management process can be implemented, which will indicate if adverse processes start in the life of the project and action plans need to be launched. The automated procedure for risk analysis based on the integrated concept delivers a more effective practical tool to reduce project risks, and opens new research areas in construction project management. (C) 2014 The Authors. Published by Elsevier Ltd. This is an open access article under he CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/).
引用
收藏
页码:510 / 519
页数:10
相关论文
共 16 条
  • [1] Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
  • [2] Beck M., 2004, RISK MANAGEMENT, V6, P13
  • [3] Learning from risks: A tool for post-project risk assessment
    Dikmen, I.
    Birgonul, M. T.
    Anac, C.
    Tah, J. H. M.
    Aouad, G.
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 18 (01) : 42 - 50
  • [4] Liquidity and risk management
    Holmström, B
    Tirole, J
    [J]. JOURNAL OF MONEY CREDIT AND BANKING, 2000, 32 (03) : 295 - 319
  • [5] Risk assessment model selection in construction industry
    KarimiAzari, AmirReza
    Mousavi, Neda
    Mousavi, S. Farid
    Hosseini, SeyedBagher
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (08) : 9105 - 9111
  • [6] KERZNER H., 2002, Project management: a systems approach to planning, scheduling and controlling
  • [7] The value of corporate risk management
    MacKay, Peter
    Moeller, Sara B.
    [J]. JOURNAL OF FINANCE, 2007, 62 (03) : 1379 - 1419
  • [8] McCrae M., 2000, RISK MANAGEMENT, P35, DOI [DOI 10.1057/PALGRAVE.RM.8240057, 10.1057/palgrave.rm.8240057]
  • [10] Miller KD, 1998, STRATEGIC MANAGE J, V19, P497, DOI 10.1002/(SICI)1097-0266(199805)19:5<497::AID-SMJ958>3.0.CO