Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract

被引:32
作者
Jang, Sejun [1 ]
Jeong, Yeonsuk [2 ]
Lee, Ghang [3 ]
Kang, Youngcheol [3 ]
机构
[1] Hyundai Engn & Construct, Smart Construct Team, 75 Yolgok Ro, Seoul 03058, South Korea
[2] GS Engn & Construct, Smart Construct Team, 33 Jong Ro, Seoul 03159, South Korea
[3] Yonsei Univ, Dept Architecture & Architectural Engn, 50 Yonsei Ro, Seoul 03722, South Korea
关键词
BIM; Design coordination; Subcontractor; Subcontracting; Motivation; INTEGRATED PROJECT DELIVERY; IMPACT; PERFORMANCE;
D O I
10.1061/(ASCE)ME.1943-5479.0000714
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces a two-step subcontracting process for building information modeling (BIM)-based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.
引用
收藏
页数:14
相关论文
共 52 条
[1]   Enhancement of IPD Characteristics as Impelled by Information and Communication Technology [J].
Ahmad, Irtishad ;
Azhar, Nida ;
Chowdhury, Arindam .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)
[2]  
AIA AIA California Council, 2012, IPD CAS STUD
[3]   Identification of coordination factors affecting building projects performance [J].
Alaloul, Wesam Salah ;
Liew, Mohd Shahir ;
Zawawi, Noor Amila Wan Abdullah .
ALEXANDRIA ENGINEERING JOURNAL, 2016, 55 (03) :2689-2698
[4]  
[Anonymous], CISC VIS NETW IND GL
[5]  
[Anonymous], 2012, P 2012 LAK CONST 5D
[6]  
[Anonymous], 2011, LEAN CONSTRUCTION J
[7]  
[Anonymous], TR172 STANF U CTR IN
[8]  
[Anonymous], OWN GUID PROJ DEL ME
[9]  
[Anonymous], P 2014 INT C CONSTR
[10]  
[Anonymous], 2012, The business value of BIM in North America: Multi-year trend analysis and user ratings (2007-2012)