COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY

被引:48
作者
Derakhshanalavijeh, Roya [1 ]
Cardoso Teixeira, Jose Manuel [2 ]
机构
[1] Bahai Inst Higher Educ, Dept Civil Engn, Tehran, Iran
[2] Univ Minho, Dept Civil Engn, Campus Azurem, P-4800058 Guimaraes, Portugal
关键词
cost overrun; construction; developing countries; Iran; case study; PERFORMANCE; DELAYS;
D O I
10.3846/13923730.2014.992467
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overrun in construction projects is a common issue affecting project performance, and Gas-Oil construction projects in Iran are no exception. This paper presents the results of a questionnaire conducted to identify and evaluate the relative importance of the significant factors contributing to the Gas-Oil construction industry of Iran as a case study for developing countries. The survey respondents included project owners, contractors and consultants involved in Iranian Gas-Oil construction projects. The results of the survey revealed that the main causes of cost overrun in this industry include inaccurate cost estimations, improper planning, frequent design changes, inadequate labour/skill availability, inflation of costs of machinery, labour, raw material and transportation prices. The first three factors are the project consultants' responsibility and the appointment of qualified consultants and personnel training are strongly recommended to alleviate cost overrun. The paper also reviews and compares findings of a set of similar researches in a number of developing countries.
引用
收藏
页码:125 / 136
页数:12
相关论文
共 30 条
  • [1] Ameh OJ, 2010, J CONSTR DEV CTRIES, V15, P49
  • [2] [Anonymous], 2013, PANA NEWS
  • [3] [Anonymous], 2012, WE CLASS COUNTRIES
  • [4] Asrilhant B., 2005, OMEGA, V35, P89
  • [5] Asrilhant Boris., 2004, EUROPEAN MANAGEMENTJ, V22, P63, DOI [10.1016/j.emj.2003.11.017, DOI 10.1016/J.EMJ.2003.11.017]
  • [6] Azhar N., 2008, Construction in developing countries proceedings of the 1st international conference, Karachi, P499
  • [7] Bazargan M., 2010, OIL CONSTRUCTION COS
  • [8] Estimating a project's profitability: A longitudinal approach
    Chen, Hong Long
    Chen, Chun-I
    Liu, Che-Hung
    Wei, Nai-Chieh
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) : 400 - 410
  • [9] An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns
    Chen, Hong Long
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (05) : 604 - 614
  • [10] Dehghan M., 2007, P 1 EX MAN C 22 23 J