A Stochastic Programming Approach on Aircraft Recovery Problem

被引:8
|
作者
Zhu, Bo [1 ]
Zhu, Jin-fu [1 ]
Gao, Qiang [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Civil Aviat, Nanjing 211100, Jiangsu, Peoples R China
关键词
AIRLINE; OPTIMIZATION; MODEL;
D O I
10.1155/2015/680609
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The unexpected aircraft failure is one of the main disruption factors that cause flight irregularity. The aircraft schedule recovery is a challenging problem in both industrial and academic fields, especially when aircraft restoration time is uncertain, which is often ignored in previous research. This paper established a two-stage stochastic recovery model to deal with the problem. The first stage model was a resource assignment model on aircraft schedule recovery, with the objective function of minimizing delay and cancellation cost. The second stage model used simple retiming strategy to adjust the aircraft routings obtained in the first stage, with the objective function of minimizing the expected cost on recourse decision. Based on different scenarios of restoration time, the second stage model can be degenerated as several linear models. A stochastic Greedy Simulated Annealing algorithm was designed to solve the model. The computational results indicate that the proposed stochastic model and algorithm can effectively improve the feasibility of the recovery solutions, and the analysis of value of stochastic solution shows that the stochastic model is worthy of implementation in real life.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Subnetwork prediction approach for aircraft schedule recovery
    Haider, Imran
    Sen, Goutam
    Arsalan, Mohd
    Das, Amit Kumar
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [42] Simulation and Stochastic Integer Programming Approach to Wildfire Initial Attack Planning
    Ntaimo, Lewis
    Gallego-Arrubla, Julian A.
    Gan, Jianbang
    Stripling, Curt
    Young, Joshua
    Spencer, Thomas
    FOREST SCIENCE, 2013, 59 (01) : 105 - 117
  • [43] Application of stochastic linear programming in managerial accounting Scenario analysis approach
    Wu, Di
    Choi, Yong
    Li, Ji
    INTERNATIONAL JOURNAL OF ACCOUNTING AND INFORMATION MANAGEMENT, 2020, 28 (01) : 184 - 204
  • [44] A stochastic programming approach for EOL electric vehicle batteries recovery network design under uncertain conditions
    Yan, Wei
    Wang, Xiao
    Liu, Ying
    Zhang, Xu-mei
    Jiang, Zhi-gang
    Huang, Lin
    SCIENTIFIC REPORTS, 2024, 14 (01)
  • [45] A Stochastic Programming Approach for the Planning and Operation of a Power to Gas Energy Hub with Multiple Energy Recovery Pathways
    Mukherjee, Ushnik
    Maroufmashat, Azadeh
    Narayan, Apurva
    Elkamel, Ali
    Fowler, Michael
    ENERGIES, 2017, 10 (07):
  • [46] A stochastic programming approach for floods emergency logistics
    Garrido, Rodrigo A.
    Lamas, Patricio
    Pino, Francisco J.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 75 : 18 - 31
  • [47] Solving a bi-objective cell formation problem with stochastic production quantities by a two-phase fuzzy linear programming approach
    Rabbani, Masoud
    Jolai, Fariborz
    Manavizadeh, Neda
    Radmehr, Farzad
    Javadi, Babak
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (5-8) : 709 - 722
  • [48] A goal programming approach for the facility layout problem with ergonomic constraint
    Adem, Aylin
    Durmaz, Esra Duygu
    Sahin, Ramazan
    Dagdeviren, Metin
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2023, 41 (05): : 947 - 957
  • [49] A constraint programming approach for the premarshalling problem
    Jimenez-Piqueras, Celia
    Ruiz, Ruben
    Parreno-Torres, Consuelo
    Alvarez-Valdes, Ramon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 306 (02) : 668 - 678
  • [50] Semi-definite Programming Approach to Stochastic Combined Heat and Power Environmental/Economic Dispatch Problem
    Jubril, Abimbola Muhideen
    Adediji, Adeyinka Olugbenga
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2015, 43 (18) : 2039 - 2049