PROJECT MANAGEMENT AND COSTING SYSTEMS: ABC SCRUM

被引:0
|
作者
Jimenez, Victor [1 ]
Afonso, Paulo [2 ]
Fernandes, Gabriela [2 ]
机构
[1] Univ Valle, Dept Accounting & Finance, Cali, Colombia
[2] Univ Minho, Dept Ind Engn, Braga, Portugal
关键词
Costing systems; Project management; Scrum methodology;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In this article we advocate the use of project management principles and agile methodologies used mainly in software design to support the development of more effective costing systems. In this context, it is important to highlight two elements: the project with its phases, initiation, planning, execution, monitoring and control and closure, and the product, which would be within the execution phase of the project, design and implementation. The proposed scrum methodology for the design of activity-based costing (ABC) models is presented and discussed. Its advantages but also some use difficulties are presented. Namely, it facilitates the active participation of stakeholders, which increases the degree of acceptance of the costing system. On the other hand, among the problems encountered in applying the proposed ABC Scrum we highlight the need of regular meetings to give and receive feedback.
引用
收藏
页码:274 / 279
页数:6
相关论文
共 50 条
  • [41] The Costing of Commercial Banks based on ABC
    Hao Su-li
    Ding Ri-jia
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 27 - 31
  • [42] PROJECT COSTING WITH MICROCOMPUTERS
    SMITH, RC
    ARMINIO, LA
    HORTSCIENCE, 1986, 21 (02) : 322 - 323
  • [43] ACCUMULATIVE PROJECT COSTING
    ASAM, EH
    RUBBER AGE, 1969, 101 (07): : 48 - &
  • [44] Agile Project Management: Better Deliveries to the End User in Software Projects with a Management Model by Scrum
    Almeida, Hugo
    Correia, Walter
    ADVANCES IN USABILITY, USER EXPERIENCE AND ASSISTIVE TECHNOLOGY, 2019, 794 : 293 - 305
  • [45] Experiences of distance education of agile project management with Scrum and supporting a tool for user stories management
    Silva, Vinicius Bernardo
    Barbosa, Marcelo Werneck
    Cardoso Carvalho, Lorena Adrian
    REVISTA BRASILEIRA DE COMPUTACAO APLICADA, 2016, 8 (01): : 2 - 13
  • [46] Cost management in small service providers using activity-based costing (ABC)
    Medianeira Stefano, Nara
    ESTUDIOS GERENCIALES, 2011, 27 (121) : 15 - 37
  • [47] Evaluating Gant Project, Orange Scrum, and ProjeQtOr Open Source Project Management Tools using QSOS
    Proenca, Catarina Romao
    Bernardino, Jorge
    ICSOFT: PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON SOFTWARE TECHNOLOGIES, 2019, : 522 - 528
  • [48] "Filling to Capacity": An Exploratory Study of Project Management Language in Agile Scrum Teams
    Friess, Erin
    TECHNICAL COMMUNICATION, 2018, 65 (02) : 169 - 180
  • [49] The influence of management information and quality management systems on the development of quality costing
    Pursglove, AB
    Dale, BG
    TOTAL QUALITY MANAGEMENT, 1996, 7 (04): : 421 - 432
  • [50] ABC's of activity-based costing
    1600, IIE, Norcross, GA, USA (36):