BUILDING INFORMATION MODELLING (BIM) AS AN ENABLER FOR WHOLE-BUILDING EMBODIED ENERGY AND CARBON CALCULATION IN EARLY-STAGE BUILDING DESIGN

被引:9
|
作者
Banteli, Amalia [1 ]
Stevenson, Vicki E. [1 ]
机构
[1] Cardiff Univ, Welsh Sch Architecture, Cardiff, Wales
关键词
BIM; embodied energy; embodied carbon; early-stage design; LIFE-CYCLE; NEED;
D O I
10.2495/BIM170091
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In recent years, there has been a worldwide effort to reduce carbon emissions from buildings. Operational energy (OE) reduction has been the main focus of the Industry as it accounts for a greater proportion of carbon emissions throughout the building life and is easier than embodied energy (EE) to predict. However, as OE is reduced, embodied energy and carbon emissions become more significant. Further to this, early-stage design decisions are crucial as they determine a significant portion of a building's life-cycle impacts and cannot easily be amended later in the life of a building. Currently though, there is a lack of legislation and guidance relating to embodied carbon (EC) in buildings. This, together with the UK construction industry fragmentation, creates a significant barrier to dealing with embodied carbon at the design stage. The UK Government has mandated the implementation of collaborative 3D BIM for all public-sector projects. This step aims to tackle cost and carbon emission reduction targets by encouraging the construction Industry to operate more collaboratively thereby enabling greater efficiency. Since BIM empowers communications and stores information into one single digital model it has the potential to enable whole-building EC calculations. This can facilitate EC calculation to be included in early-design stage. This paper looks at literature that relates to BIM and EC's role in early-stage design and draws conclusions on how BIM can enable EC calculation inclusion to early-stage design. It establishes a correlation between the matrix of information required for BIM and the information required for whole-building EC calculations. This research aims to reveal the actors and processes involved in providing this information and suggest the project stages that EC calculations should take place in early-stage design. The future benefit is to inform practice and policy to enable EC reduction through BIM in order to meet overall carbon targets.
引用
收藏
页码:89 / 100
页数:12
相关论文
共 50 条
  • [21] Including embodied energy considerations at the conceptual stage of building design
    Yohanis, Y. G.
    Norton, B.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 2006, 220 (A3) : 271 - 288
  • [22] Using Open BIM and IFC to Enable a Comprehensive Consideration of Building Services within a Whole-Building LCA
    Theissen, Sebastian
    Hoeper, Jannick
    Drzymalla, Jan
    Wimmer, Reinhard
    Markova, Stanimira
    Meins-Becker, Anica
    Lambertz, Michaela
    SUSTAINABILITY, 2020, 12 (14)
  • [23] Sustainable Building Optimization Model for Early-Stage Design
    Elbeltagi, Emad
    Wefki, Hossam
    Khallaf, Rana
    BUILDINGS, 2023, 13 (01)
  • [24] Sustainable Building Design based on Building Information Modeling (BIM)
    Kurian, Ciji Pearl
    Milhoutra, Shivani
    George, V. I.
    2016 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2016,
  • [25] Strategies for connecting whole-building LCA to the low-carbon design process
    Mccord, Kieren H.
    Dillon, Heather E.
    Gunderson, Patricia
    Carlson, Sadie
    Phillips, Adam R.
    Griechen, Darrin
    Antonopoulos, Chrissi A.
    ENVIRONMENTAL RESEARCH: INFRASTRUCTURE AND SUSTAINABILITY, 2024, 4 (01):
  • [26] Generative Design in Building Information Modelling (BIM): Approaches and Requirements
    Ma, Wei
    Wang, Xiangyu
    Wang, Jun
    Xiang, Xiaolei
    Sun, Junbo
    SENSORS, 2021, 21 (16)
  • [27] Building ontology to implement the BIM(Building Information Modeling) focused on pre-design stage
    Lee, Joo-Sung
    Min, Kyung-Min
    Lee, Yoon-Sun
    Kim, Ju-Hyung
    Kim, Jae-Jun
    25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 350 - +
  • [28] USING BUILDING INFORMATION MODELING TO ASSESS THE INITIAL EMBODIED ENERGY OF A BUILDING
    Shrivastava, Sandeep G
    Chini, Abdol
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2012, 12 (01) : 51 - 63
  • [29] Life-cycle building information modelling (BIM) engaged framework for improving building energy performance
    Xu, Xiaoxiao
    Mumford, Tim
    Zou, Patrick X. W.
    ENERGY AND BUILDINGS, 2021, 231
  • [30] Life cycle energy analysis of a glazed commercial building using building information modelling (BIM) tools
    Kavitha, B.
    Molykutty, M., V
    MATERIALS TODAY-PROCEEDINGS, 2021, 37 : 940 - 946