Failure analysis and control mechanism of gob-side entry retention with a 1.7-m flexible-formwork concrete wall: A case study

被引:34
作者
Xie, Shengrong [1 ,2 ]
Wang, En [1 ]
Chen, Dongdong [1 ]
Sun, Yaohui [1 ]
Cheng, Qiong [1 ]
Ji, Chunwei [1 ]
Yan, Zhiqiang [1 ,3 ]
Xiao, Haibin [1 ,4 ]
机构
[1] China Univ Min & Technol Beijing, Sch Energy & Min Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol Beijing, Beijing Key Lab Precise Min Intergrown Energy & R, Beijing 100083, Peoples R China
[3] Fenxi Min Grp Co Ltd, Jinzhong 032000, Peoples R China
[4] Fenxi Min Grp Co Ltd, Hexi Coal Mine, Lvliang 033300, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Gob-side entry retention (GER); Failure analysis; Control mechanism; Roadside backfilling body (RBB); Plastic zone; CONTROL TECHNOLOGY; EVOLUTION; FRACTURE; ROADWAY; DESIGN; ROOF;
D O I
10.1016/j.engfailanal.2020.104816
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Gob-side entry retention (GER) improves coal resources recovery rate and solves the gas problem at the working face and is thus of great importance. In consideration of the existing GER results that lack a failure mechanism for GER with double roadways and roadside backfilling body (RBB) width below 2 m, taking the first test section of GER with double roadways of No. 3 coal seam of the Hexi mine as the research object, the uniaxial compressive strength of each age concrete is obtained through laboratory tests. Numerical simulation and theoretical calculations are used to comprehensively determine the optimal width of the flexible-formwork concrete wall of GER. The distribution and evolution of plastic zone and vertical stress of surrounding rock in different positions are simulated after mining for a certain distance. The results demonstrate that the plastic zone of surrounding rock of the roadway evolves morphologically as asymmetrical ellipse -> asymmetrical circle -> small semicircular arch -> large semicircular arch. The maximum depths of plastic zone and the peak vertical stress in solid coal side are 3.56 m and 3.50 m, respectively, and the roof and solid coal present obvious asymmetric failure characteristic. The flexible-formwork concrete wall is completely in the plastic state, and the peak stress is mainly concentrated in the middle of RBB. Based on the above analyses, a zoning asymmetric coupling control technology named narrow flexible-formwork wall with steel bar reinforcement along single prop wall + strong double-row single props + high-strength and high-preloading asymmetric anchor cable is proposed, and its support mechanism is clarified. The on-site monitoring results demonstrate that the convergence of surrounding rock of GER is effectively controlled.
引用
收藏
页数:16
相关论文
共 35 条
  • [31] Combined Supporting Technology with Bolt-Grouting and Floor Pressure-Relief for Deep Chamber: An Underground Coal Mine Case Study
    Zhai, Xinxian
    Huang, Guangshuai
    Chen, Chengyu
    Li, Rubo
    [J]. ENERGIES, 2018, 11 (01):
  • [32] Numerical Estimation of Suitable Gob-Side Filling Wall Width in a Highly Gassy Longwall Mining Panel
    Zhang, Guang-chao
    Tan, Yun-liang
    Liang, Sai-jiang
    Jia, Hong-guo
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2018, 18 (08)
  • [33] ZHANG JP, 2019, METALS-BASEL, V9, DOI DOI 10.3390/MET9030346
  • [34] Stress Evolution in Roadway Rock Bolts During Mining in a Fully Mechanized Longwall Face, and an Evaluation of Rock Bolt Support Design
    Zhang, Kai
    Zhang, Guimin
    Hou, Rongbin
    Wu, Yu
    Zhou, Hongqi
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2015, 48 (01) : 333 - 344
  • [35] An Innovative Approach for Gob-Side Entry Retaining With Thick and Hard Roof: A Case Study
    Zhang, Zizheng
    Wang, Weijun
    Li, Shuqing
    Bai, Jianbiao
    Hao, Shengpeng
    Wu, Hai
    Yu, Xianyang
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2018, 25 (04): : 1028 - 1036