Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent

被引:10
作者
Cetinkaya, Ferda C. [1 ]
机构
[1] Eastern Mediterranean Univ, Dept Ind Engn, Gazimagusa, TRNC, Cyprus
关键词
automated guided vehicle; lot streaming; scheduling; sequencing; transfer batches;
D O I
10.1007/s00170-004-2493-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The process of splitting a job lot comprised of several identical units into transfer batches (some portion of the lot), and permitting the transfer of processed transfer batches to downstream machines, allows the operations of a job lot to be overlapped. The essence of this idea is to increase the movement of work in the manufacturing environment. In this paper, the scheduling of multiple job lots with unit sized transfer batches is studied for a two-machine flow-line cell in which a single transport agent picks a completed unit from the first machine, delivers it to the second machine, and returns to the first machine. A completed unit on the first machine blocks the machine if the transport agent is in transit. We examine this problem for both unit dependent and independent setups on each machine, and propose an optimal solution procedure similar to Johnson's rule for solving the basic two-machine flowshop scheduling problem.
引用
收藏
页码:178 / 183
页数:6
相关论文
共 17 条
[1]   LOT STREAMING IN THE 2-MACHINE FLOW-SHOP WITH SETUP TIMES [J].
BAKER, KR .
ANNALS OF OPERATIONS RESEARCH, 1995, 57 :1-11
[2]   UNIT SIZED TRANSFER BATCH SCHEDULING WITH SETUP TIMES [J].
CETINKAYA, FC ;
KAYALIGIL, MS .
COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 22 (02) :177-183
[4]   Lot streaming in job-shop scheduling [J].
DauzerePeres, S ;
Lasserre, JB .
OPERATIONS RESEARCH, 1997, 45 (04) :584-595
[5]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[6]  
Johnson Selmer Martin., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110, 10.1002/(ISSN)1931-9193]
[7]   Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage [J].
Kim, JS ;
Kang, SH ;
Lee, SM .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1997, 25 (05) :547-555
[8]  
LEVLER E, 1995, ANN OPER RES, V57, P217
[9]   SEQUENCING N-JOBS ON 2 MACHINES WITH ARBITRARY TIME LAGS [J].
MITTEN, LG .
MANAGEMENT SCIENCE, 1959, 5 (03) :293-298
[10]  
PANWALKAR SS, 1991, J OPER RES SOC, V42, P609