共 50 条
- [1] Critical chain, project schedule management based on Bayesian Network model Tongji Daxue Xuebao, 10 (1606-1612):
- [2] PROJECT SCHEDULE MANAGEMENT BASED ON CRITICAL CHAIN METHOD ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 269 - 273
- [3] Fuzzy optimization of construction engineering project schedule based on critical chain management Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
- [4] Research on Software Project Schedule Based on Critical Chain 2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
- [5] Dynamic safety evaluating based on project network schedule Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology, 2002, 24 (02):
- [7] Research on Critical Chain Identification Methods of Project Schedule Management in China 2018 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MANAGEMENT SCIENCE AND ENGINEERING (AMSE 2018), 2018, 292 : 75 - 78
- [9] Identifying the critical chain in the schedule of random network based on GERTs Shi, Q. (qianshi@mail.tongji.edu.cn), 1600, Systems Engineering Society of China (32): : 1531 - 1536
- [10] The Analysis of Bank Mobile Payment Project's Schedule Management Based on Improved Critical Chain Method PROCEEDINGS OF THE 2ND INTERNATIONAL SYMPOSIUM ON BUSINESS CORPORATION AND DEVELOPMENT IN SOUTH-EAST AND SOUTH ASIA UNDER B&R INITIATIVE (ISBCD 2017), 2017, 42 : 20 - 24