Risk-based maintenance scheduling of generating units in the deregulated environment considering transmission network congestion

被引:16
作者
Golmohamadi, Hessam [1 ]
Ramezani, Maryam [1 ]
Bashian, Amir [2 ]
Falaghi, Hamid [1 ]
机构
[1] Univ Birjand, Fac Elect & Comp Engn, Birjand, Iran
[2] Ferdowsi Univ Mashhad, Dept Power Elect Engn, Mashhad, Iran
关键词
Congestion; Security; Transmission network; Unit maintenance scheduling; COORDINATION;
D O I
10.1007/s40565-014-0058-y
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In restructured power systems, the traditional approaches of unit maintenance scheduling (UMS) need to undergo major changes in order to be compatible with new competitive structures. Performing the maintenance on generating units may decrease the security level of transmission network and result in electricity shortage in power system; as a result, it can impose a kind of cost on transmission network as called security cost. Moreover, taking off line a generating unit for performing maintenance can change power flow in some transmission lines, and may lead to network congestion. In this study, generating unit maintenance is scheduled considering security and congestion cost with N-1 examination for transmission lines random failures. The proposed UMS approach would lead to optimum operation of power system in terms of economy and security. To achieve this goal, the optimal power flow (OPF) compatible with market mechanism is implemented. Moreover, the electricity price discovery mechanism as locational marginal pricing (LMP) is restated to analyze the impacts of UMS on nodal electricity price. Considering security and congestion cost simultaneously, this novel approach can reveal some new costs which are imposed to transmission network on behalf of generation units; as a result, it provides a great opportunity to perform maintenance in a fair environment for both generating companies (GenCo) and transmission companies (TransCo). At the end, simulation results on nine-bus test power system demonstrate that by using this method, the proposed UMS can guarantee fairness among market participants including GenCos and TransCo and ensure power system security.
引用
收藏
页码:150 / 162
页数:13
相关论文
共 19 条
[1]  
Arce J, 2004, P CARN MELL C EL TRA
[2]   Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach [J].
Billinton, R ;
Abdulwhab, A .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2003, 150 (04) :463-468
[3]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[4]   Optimal power flow with expected security costs [J].
Condren, J ;
Gedra, TW ;
Damrongkulkamjorn, P .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (02) :541-547
[5]   Generation maintenance scheduling considering transmission constraints [J].
da Silva, EL ;
Schilling, MT ;
Rafael, MC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :838-843
[6]  
Enderyi J., 1978, RELIABILITY MODELING
[7]   Security-constrained optimal coordination of generation and transmission maintenance outage scheduling [J].
Fu, Yong ;
Shahidehpour, Mohammad ;
Li, Zuyi .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (03) :1302-1313
[8]   Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems [J].
Geetha, T. ;
Swarup, K. Shanti .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2009, 31 (10) :626-638
[9]   Unit maintenance scheduling coordination mechanism in electricity market environment [J].
Lu, G. ;
Chung, C. Y. ;
Wong, K. P. ;
Wen, F. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2008, 2 (05) :646-654
[10]  
Lu G, 2008, 2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, P720