HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model

被引:8
作者
Wu, Han [1 ]
Liu, Sen [1 ]
Liu, Denghui [2 ]
Wang, Junwu [1 ]
机构
[1] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[2] China Construct First Grp Corp Ltd, Beijing 100161, Peoples R China
基金
国家重点研发计划;
关键词
CHINA; IDENTIFICATION; MANAGEMENT; IMPACT;
D O I
10.1155/2020/8882903
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The health, safety, and environment (HSE) risk assessment of major sewage transport tunnel projects (MSTTPs) is of great significance to guarantee sewage treatment, ecological environment protection, and sustainable development. To accurately evaluate the HSE risk of MSTTPs at the construction stage and effectively deal with their randomness and ambiguity, a risk assessment model based on the structural entropy weight method (SEWM) and the cloud model is put forward in this paper. First, an index system for MSTTPs was constructed via a literature review and expert interviews, and the rough sets method was used to filter the indicators. Then, weights were calculated by the SEWM, which is able to consider both subjective and objective factors of the weight calculation. Finally, to clarify the randomness and ambiguity in the evaluation, the HSE risk level was determined by the cloud similarity. The model was applied to the Donghu Deep Tunnel Project in Wuhan, China, and the results demonstrated that its HSE risk level was medium, which was acceptable. The index related to construction safety had the largest weight. A humid environment, improper power utilization, and sludge and mud pollution were found to be the most influential risk indicators. The risk level could be intuitively and qualitatively judged by the figure evaluation cloud, providing a vivid and rapid evaluation tool for the emergency decision-making of project managers, and the risk level could be quantitatively judged by the calculation of cloud similarity. Moreover, through the comparison with gray correlation degree, set pair analysis, and fuzzy comprehensive evaluation method evaluation results, we prove the scientificity and effectiveness of the proposed model. The research results provide a valuable reference for the project management of MSTTPs at the construction stage.
引用
收藏
页数:12
相关论文
共 23 条
[1]   Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model [J].
Zhang, Yaqiong ;
He, Nan ;
Li, Yijing ;
Chen, Yiyang ;
Wang, Lei ;
Ran, Yunlong .
DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
[2]   Safety risk assessment of loess tunnel construction under complex environment based on game theory-cloud model [J].
Han, Bing ;
Jia, Wei ;
Feng, Weixing ;
Liu, Liu ;
Zhang, Zhe ;
Guo, Yinhu ;
Niu, Mingjie .
SCIENTIFIC REPORTS, 2023, 13 (01)
[3]   Risk assessment of construction safety of prefabricated building hoisting based on cloud model-entropy method [J].
Fang, Chengkuan ;
Zhong, Chunling ;
Zhang, Yunlong .
INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2022, 70 (3-4) :233-243
[4]   A Risk Assessment Method for Metro Shield Tunnel Construction Based on Interval Number [J].
Zhang, Yeqin ;
Zhang, Jiaming ;
Guo, Hailin ;
Zhou, Yang ;
Ma, Guofu ;
Wang, Cong .
GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (05) :4793-4809
[5]   Risk evaluation of metro tunnel shield construction based on game variable weight extension cloud theory [J].
Sun, Xiaowen ;
Wu, Lirong ;
Wu, Dun .
SCIENTIFIC REPORTS, 2025, 15 (01)
[6]   Construction risk probability assessment of shield tunneling projects in karst areas based on improved two-dimensional cloud model [J].
Sun, Huaiyuan ;
Rui, Yi ;
Lu, Yanyun ;
Dai, Yiming ;
Wang, Xiang ;
Li, Xiaojun .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 154
[7]   Safety risk assessment of weak tunnel construction with rich groundwater using an improved weighting cloud model [J].
Sheng, Danjie ;
Tan, Fei ;
Zhang, Yu ;
Zhu, Haijun ;
Zuo, Changqun ;
Lv, Jiahe .
SCIENTIFIC REPORTS, 2025, 15 (01)
[8]   Risk assessment of infrastructure REITs projects based on cloud model: a case study of China [J].
Wang, Yousong ;
Gong, Enqin ;
Zhang, Yangbing ;
Yao, Yao ;
Zhou, Xiaowei .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) :4330-4352
[9]   Risk assessment of loess tunnel collapse during construction based on an attribute recognition model [J].
Xu, Zengguang ;
Cai, Ningguo ;
Li, Xiaofeng ;
Xian, Meiting ;
Dong, Tuanwei .
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (08) :6205-6220
[10]   Dynamic risk early warning system for tunnel construction based on two-dimensional cloud model [J].
Sun, Huaiyuan ;
Zhu, Mengqi ;
Dai, Yiming ;
Liu, Xiangsheng ;
Li, Xiaojun .
EXPERT SYSTEMS WITH APPLICATIONS, 2024, 255