Experimental investigation on the steam injection profile along horizontal wellbore

被引:15
作者
Dong, Xiaohu [1 ]
Liu, Huiqing [1 ]
Zhai, Yong [2 ]
Wang, Changjiu [1 ]
Chen, Zhangxin [1 ,3 ]
Liu, Dongqing [2 ]
机构
[1] China Univ Petr, State Key Lab Petr Resources & Prospecting, Beijing 102249, Peoples R China
[2] Sinopec, Res Inst Petr Engn, Shengli Oilfield, Dongying 257000, Shandong, Peoples R China
[3] Univ Calgary, Dept Chem & Petr Engn, Calgary, AB T2N 1N4, Canada
基金
北京市自然科学基金;
关键词
Heavy oil reservoir; Steam injection; Horizontal well; Steam conformance; Thermal recovery; MULTI-THERMAL FLUID; HEAVY-OIL-RECOVERY; MASS-TRANSFER; PERFORMANCE; WELLS; FLOW; PREDICTION;
D O I
10.1016/j.egyr.2020.01.005
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Horizontal well based thermal recovery processes have been widely applied to recover the heavy oil resources all over the world. But, the flow behavior of hot fluids along a horizontal wellbore is still unclear. In this paper, a scaled cylindrical wellbore model is designed to experimentally simulate the steam injection process using horizontal well. Based on this model, a set of experiments are firstly performed to analyze the steam injection profile along horizontal wellbore. And the effects of different sensitive parameters on stream conformance are discussed. Results indicate that different steam injection operation can yield a different heating performance. During steam injection process, the wellbore segments closed to the steam outflow point can have a better heating performance. In comparison, a high steam injection rate is more beneficial on the uniform steam conformance along horizontal wellbore. The two-ends steam injection strategy can produce a more uniform steam injection profile than the single heel/toe end injection method. The addition of non-condensable gas (NCG) can also improve the steam conformance along horizontal wellbore. Moreover, from the experimental observation, it is also observed that the permeability heterogeneity along the horizontal wellbore is a significantly important parameter on the steam injection profile. The well completion method tremendously impacts the steam conformance along horizontal wellbore. For field operation, in order to obtain a more uniform steam conformance, it should be avoided to place the horizontal well in a high heterogeneous area, and slotted liner will be the preferred method for a horizontal well based thermal recovery process. (C) 2020 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:264 / 271
页数:8
相关论文
共 39 条
[1]  
Ali SF, 2007, LECT NOTES
[2]  
[Anonymous], SPE AS PAC OIL GAS C
[3]  
[Anonymous], 2006, THESIS
[4]  
[Anonymous], 2013, SPE HEAV OIL C CAN C
[5]  
Bjomdalen N., 1999, 8 PETR C S SASK SECT
[6]  
Butler R.M., 1991, Thermal Recovery of Oil and Bitumen
[7]   RISE OF INTERFERING STEAM CHAMBERS [J].
BUTLER, RM .
JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1987, 26 (03) :70-75
[8]   A NEW APPROACH TO THE MODELING OF STEAM-ASSISTED GRAVITY DRAINAGE [J].
BUTLER, RM .
JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1985, 24 (03) :42-51
[9]  
[陈德民 CHEN Deming], 2007, [西南石油大学学报, Journal of Southwestern Petroleum Institute. Natural Science Edition], V29, P102
[10]   A novel analytical transient heat-conduction time function for heat transfer in steam injection wells considering the wellbore heat capacity [J].
Cheng, Wen-Long ;
Huang, Yong-Hua ;
Lu, De-Tang ;
Yin, Hong-Ru .
ENERGY, 2011, 36 (07) :4080-4088